Manufactured home permits in Texas

Sources last checked

Texas has no single permit for a manufactured home. The Texas Department of Housing and Community Affairs (TDHCA) licenses installers and receives a Notice of Installation (Form T) after each home is installed. Approval for the site itself, often called a setup permit, comes from the county or city, and from the septic, floodplain, road and utility offices that serve the property.

new manufactured homes shipped to Texas in 2025
17,458
counties, each with its own local process
254
TDHCA Form T fee for a single-section home, plus $25 per extra section
$75
Get a quote for Texas For dealers and installers

Who regulates manufactured homes in Texas?

Several offices share the job, and each one covers a different part. The federal government sets how the home is built. TDHCA regulates how it is installed. The county, the city and the local utilities decide whether the site is ready for it.

What Who handles it What it does not cover
How the home is built HUD, through the federal HUD Code Where the home may be placed
Installation, installer licences and installation reports TDHCA Manufactured Housing Division County or city approval of the site
Ownership and location records TDHCA, through the Statement of Ownership Permission to place the home on a site
Where homes may go inside a city The city, within limits set by state law Land outside that city
Site development, septic, floodplain, driveway and utilities The county or city, the septic (OSSF) authority, the road authority and the utilities, depending on the property No single office approves all of them
Moving the home on the road Texas Department of Motor Vehicles (TxDMV) Approval at the new site

Manufactured homes are built to a federal standard, the HUD Code. Installation is regulated separately, and Texas runs its own installation program through TDHCA instead of leaving it to HUD. The state rules are in Chapter 1201 of the Texas Occupations Code and 10 TAC Chapter 80.

Is there one permit for a manufactured home in Texas?

No. The state report filed after installation and the local approvals for the site are separate, and the local approvals can come from several offices.

Depending on the property, a placement can need a development or placement permit, a septic (OSSF) permit, a floodplain permit, a driveway or culvert permit, and separate electrical or plumbing permits. “Setup permit” is how many people search for this, but each county and city gives its application its own official name. Use that name when you contact the office.

How do you find the right permit office for a property?

Start from the parcel, not the mailing address. A property with a city’s mailing address can sit outside that city’s limits, and the reverse.

  1. Collect the legal description, parcel number, proposed 911 address and the survey or plat.
  2. Ask the county and the nearest city to confirm whether the property is inside city limits or a city planning area, and which approvals each office handles.
  3. Identify the water and wastewater provider or septic (OSSF) authority, the electric provider, the floodplain office and the road authority.
  4. Keep the office’s answer in writing, and note whether the home is new, used, a replacement, a rental or part of a community. Requirements can differ for each.

Counties say this themselves. Montgomery County’s checklist warns that properties under a city’s jurisdiction may need other documents. Bastrop County notes that the cities of Bastrop, Elgin and Smithville have their own zoning.

What does the State of Texas require?

A licensed installer. A person may not act as an installer without an installer’s licence (Occupations Code 1201.101). TDHCA says an owner cannot install, relevel or modify the foundation of their own home.

The right installation instructions. A new home must be installed to the manufacturer’s DAPIA-approved installation instructions. A used home may use other methods the rules allow, including the manufacturer’s instructions, the state’s generic standards, a registered stabilization system or a special system under the conditions the rule sets (Rule 80.21).

A Notice of Installation (Form T) after the home is installed.

Form T What the rules say
Who files it The licensed installer
When TDHCA’s instructions say within seven days after installation. Installers on a provisional licence have three; the rule says three business days
Fee $75 for a single-section home, plus $25 for each additional section (Rule 80.3(b))
How Online, using the installer’s licence number and expiry date

Form T is a report to the state. It is not a local permit, and filing it does not approve the site.

Licensed trades for certain work. The rules require a licensed electrician for certain electrical feeder work and a licensed air-conditioning contractor for air-conditioning work (Rules 80.25 and 80.33).

Flood hazard areas. Texas law sets specific obligations for retailers, brokers and salespeople when a home is going to a site in a special flood hazard area, with listed exemptions (section 1201.512). Check the site’s flood status before delivery.

What changed for Texas cities on September 1, 2026?

Section 1201.008 of the Occupations Code was amended with effect from September 1, 2026. A city with zoning must now allow new HUD-code manufactured homes by right in at least one residential zoning category, and apply that category to land. The law has exceptions, and it is not a right to place a home on every residential lot.

The same section also covers:

  • Deadlines on city decisions. A city has 45 days to deny an application to install a new HUD-code home in writing; the statute treats an application not denied in time as granted. That applies to the city’s decision on that application, not to septic, floodplain, utility or other approvals.
  • Replacements. A city must allow an existing home to be replaced by a newer home at least as large in living space, under the conditions in the section. A city may limit this to a single replacement, and homes lost to fire or natural disaster have extra protection.

City guidance written before September 2026 may not reflect the amended law. Ask the city how its current rules apply to your project.

How are new, used, moved and replacement homes treated?

Situation What is different
New home Installed to the manufacturer’s DAPIA-approved instructions. The rules give the installer site-preparation responsibilities
Used home Other installation methods are allowed (see above). Site-preparation and drainage responsibility differs from a new home
Moved home Needs TxDMV authorisation to move. After the move, the owner applies to TDHCA for a revised Statement of Ownership within 60 days
Replacement in a city Protected for a newer home at least as large in living space, under the conditions in section 1201.008

County and city offices can also ask for different documents in each case, so tell the office which one applies.

What do Texas counties ask for?

There is no statewide county checklist. Here is what three counties publish, as checked on November 16, 2026. Each office can ask for more, so confirm before you submit.

Montgomery County

Permit Department, 501 North Thompson, Suite 100, Conroe, TX 77301. 936-539-7836.

The county’s permit checklist asks for:

  • a residential development application
  • a stormwater management compliance certificate
  • water and sewer letters for the specific address, dated within the past year and confirming service. Letters that state only capacity are rejected. Where there is no sewer, septic documents instead
  • the legal description
  • a site plan or survey of the entire property
  • where they apply: drainage sign-off, floodplain documents for sites within 100 feet of the floodplain or floodway, Precinct 4 culvert verification, and a Form 101 for the Houston planning area

The site plan must show all lot boundaries, the exact proposed placement, existing and proposed structures, the septic system and its spray or drip field, any well, the disturbed area and floodplain boundaries. Cropped or zoomed-in plans are not accepted.

Documents must be printed on 8.5 x 11 paper, single-sided, with separate checks or money orders payable to Montgomery County. Once a permit is generated its details cannot be changed; a new permit must be purchased. For the fee, use the county’s current fee schedule.

Bastrop County

Development Services, 211 Jackson Street, Bastrop, TX 78602. 512-581-7176.

Bastrop County says:

  • every application needs proof of ownership, a dimensioned site plan and a survey or plat. More may be requested
  • where public wastewater is not available, the septic (OSSF) application and the development application are submitted together, with floor plans for the OSSF review
  • applications and supporting documents can be uploaded online through MyGovernmentOnline, and staff can be messaged there
  • the county does not issue building permits or certificates of occupancy. That does not mean no permit: the development permit is still required
  • the cities of Bastrop, Elgin and Smithville have their own zoning. County rules for unincorporated land are not city rules

Fees are in the county’s adopted fee schedule of June 20, 2025. Confirm which category your project falls in.

Liberty County

311 Travis Street, Liberty, TX 77575, 936-336-4560. Cleveland office: 1616 County Road 3549, Cleveland, TX 77327, 832-579-1135.

Liberty County’s permit page links to an online permit portal and an Agent Authorization Affidavit. A county notice approved June 9, 2026 says work started or completed without the required permits pays double permit fees, and that permits must be displayed.

The City of Liberty is a separate office with its own manufactured home application. A property inside the city follows city rules, not county rules.

What does a site plan need to show?

It depends on the office, which is why a generic plan gets sent back. Montgomery County wants the entire property with the septic field, well, disturbed area and floodplain marked. Bastrop County wants a dimensioned plan with the survey or plat. Before drawing, get the office’s own list.

Stampd draws site plans for manufactured home placements to the receiving office’s requirements.

What happens after the home is installed?

Three things happen separately, and finishing one does not finish the others:

  1. The state report. The licensed installer files Form T with TDHCA.
  2. Local inspections and closeout. Septic, floodplain, trade and development inspections, depending on the office. Ask what releases power to the home.
  3. Ownership records. After a move, the owner applies for a revised Statement of Ownership within 60 days. TDHCA says complete regular applications take up to 15 business days. That is ownership paperwork, not a permit review time.

Texas county permit guides

What each county asks for, who issues the permit, and the offices involved, for the counties with the most manufactured home installations.

FAQ

Common questions

Is Form T a permit to place a manufactured home in Texas?

No. Form T, the Notice of Installation, is a report the licensed installer files with the Texas Department of Housing and Community Affairs after the home is installed. It does not replace the county or city approvals for the site, such as a development permit, septic approval or floodplain permit.

When is Form T due in Texas, and what does it cost?

TDHCA's instructions say Form T is due within seven days after the installation, or within three days for an installer on a provisional licence; the rule itself says three business days for provisional installers. The fee is $75 for a single-section home and $25 for each additional section. Installers file it online with their licence number.

Can a homeowner install their own manufactured home in Texas?

No. Texas law says a person may not act as an installer without an installer's licence, and TDHCA says an owner cannot install, relevel or modify the foundation of their own home.

Do Texas cities have to allow manufactured homes?

From September 1, 2026, a Texas city with zoning must allow new HUD-code manufactured homes by right in at least one residential zoning category and apply that category to land, subject to exceptions in section 1201.008 of the Occupations Code. It is not a right to place a home on every residential lot.

Do used manufactured homes follow the same installation rules as new homes in Texas?

Not exactly. A new home must be installed to the manufacturer's DAPIA-approved installation instructions. A used home may use other methods the TDHCA rules allow, including the manufacturer's instructions, the state's generic standards or a registered stabilization system. Either way, the work must be done by a licensed installer.

If a Texas county does not issue building permits, is no permit needed?

No. Bastrop County, for example, says it does not issue building permits or certificates of occupancy, but it still requires a development permit, and a septic (OSSF) application where public wastewater is not available.

What has to happen when a manufactured home is moved in Texas?

Moving the home on the road needs authorisation from the Texas Department of Motor Vehicles. After the move, the owner must apply to TDHCA for a revised Statement of Ownership within 60 days. The county or city approvals at the new site are separate from both.

How do I find which office issues the permit for a Texas property?

Work from the parcel, not the mailing address. With the legal description, parcel number and proposed 911 address, ask the county and the nearest city to confirm whether the property is inside city limits or a city planning area, and which approvals each office handles. Then identify the septic or wastewater authority, floodplain office, road authority and utilities.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077