Mississippi permit guide

Manufactured home permits in Mississippi

Sources last checked

Mississippi has no single permit for a manufactured home. The State Fire Marshal's Factory-Built Home Division licenses installers and runs the state installation rules, known as MH-5, which require the state and local permits to be in place before installation. Placement, floodplain, wastewater and power approvals come separately from the county or city and the health department.

new manufactured homes shipped to Mississippi in 2025
3,994
current MH-5 installation rules took effect
July 1, 2026
Get a quote for Mississippi For dealers and installers

Who regulates manufactured homes in Mississippi?

The state licenses installers and sets the installation rules. The county or city decides whether the home may go on the site. Wastewater, title and tax are each handled separately.

What Who handles it What it does not cover
Installer and transporter licences, installation rules (MH-5) Mississippi Insurance Department, State Fire Marshal’s Office, Factory-Built Home Division County or city approval of the site
Placement and zoning The county or city for the property Other jurisdictions
Wastewater The Mississippi State Department of Health and the sewer authority Placement approval
Title and tax registration County tax officials and the Mississippi Department of Revenue Permission to place the home

The Factory-Built Home Division can be reached on 601-359-1061. Its program page has the current rules, licence information and forms. Modular homes have their own rules on the same page, so do not mix the two.

Is there one permit for a manufactured home in Mississippi?

No. The state installation process and the local placement permit are separate, and the MH-5 rules require the applicable state and local permits before installation. Depending on the property, wastewater approval, flood documents and power release also apply. Title and tax records are separate again.

How do you find the right permit office for a property?

Start from the parcel, not the mailing address. A postal city does not tell you which office has jurisdiction.

  1. Collect the parcel number, legal description, survey or plat, street address and ownership details.
  2. Confirm whether the property is inside city limits, how it is zoned, and which office issues the placement permit.
  3. Identify the sewer provider or health department, the water and electric providers, road access and the flood zone.
  4. Note whether the home is new, used, a replacement or going into a community. Requirements can differ for each.

Watch for names that sound alike. Jackson County is not the City of Jackson, which is elsewhere in the state.

What does the State of Mississippi require?

The rules are in MH-5, effective July 1, 2026. Older copies of MH-5 are out of date.

Licensed installers and transporters. The state licenses both. MH-5 has a narrow exception that lets an owner set up their own home under conditions on the property, ownership, use and transport. It is not a general right to use unlicensed movers.

Permits before installation. The applicable state and local permits must be in place before the home is installed.

A property locator and certificate of installation. MH-5 sets out a property locator and certificate of installation process. Who files, and when, depends on whether a retailer is involved, and differs for new homes and homes moved to a new site. The rules word the deadlines differently in different places, so confirm the timing with the division.

The right installation instructions. New and used installations are treated separately. A used home whose manufacturer’s instructions are not available has its own route in the rules.

Inspection access. Coordinate skirting and deck work with the state installation inspection, so the inspector can see what they need to.

The right form. The state’s Affidavit of Homeowner Statement declares that a home will not be used for human habitation. It is not a self-install form.

What do Mississippi counties ask for?

There is no statewide county checklist. Here is what three counties publish, as checked on November 17, 2026. Each office can ask for more, so confirm before you submit.

Jackson County

Building Department. Inspection line: 228-769-3056.

Jackson County’s placement packet asks for:

  • the parcel and deed
  • a site or survey plan
  • utility and environmental certification
  • registration
  • consent and permission documents where the applicant is not the owner
  • the home’s data plate
  • flood certificates, where the property is in a flood zone

The application is signed by the applicant or an authorised agent. The packet describes three inspection stages: placement, initial power and final. A placement permit is valid for 90 days. Applications can be made online through the Building Department, which asks applicants to confirm current fees.

Panola County

Land Development Office, 245 Eureka Street, Batesville.

Panola County asks for deed or sale documents and consent from the owner or landlord. Its page also sets out county criteria on the home’s age, the site and the foundation; read them before committing to a home. The final inspection and certificate of occupancy come before permanent power. These are county rules; property inside Batesville or Sardis follows city rules.

Harrison County

Zoning and Planning. 228-831-3367.

Harrison County shows that zoning can need a hearing. A 2024 county case for a manufactured home in the E-1 district went through conditional-use approval, with a site plan and survey attached. One approval is not permission for every property in that district. County zoning does not apply inside Gulfport, Biloxi or other cities.

What does a site plan need to show?

It depends on the office. Jackson County wants a site or survey plan, with flood certificates where they apply. Harrison County’s zoning cases carry a site plan and survey. Before drawing, get the office’s own list.

Stampd draws site plans for manufactured home placements to the receiving office’s requirements.

What happens after the home is installed?

Several things happen separately:

  1. The state process. The property locator and certificate of installation, and the state installation inspection.
  2. Local inspections and power. Jackson County runs placement, initial power and final inspections. Panola County issues its certificate of occupancy before permanent power.
  3. Title and tax. Title affixation or retirement through the Department of Revenue, and county tax registration, are separate steps.

FAQ

Common questions

Who regulates manufactured home installation in Mississippi?

The Factory-Built Home Division of the State Fire Marshal's Office, part of the Mississippi Insurance Department. It licenses installers and transporters and administers the MH-5 rules, effective July 1, 2026.

Do I need permits before installing a manufactured home in Mississippi?

Yes. MH-5 requires the applicable state and local permits before installation. The county or city placement permit, wastewater approval and any flood documents are separate from the state process.

Can a homeowner set up their own manufactured home in Mississippi?

Only under a narrow exception in MH-5, with conditions on the property, ownership, use and how the home is transported. It is not a general right to use unlicensed movers or installers.

Is the Mississippi Affidavit of Homeowner Statement a self-install form?

No. The state's Affidavit of Homeowner Statement is a declaration that the home will not be used for human habitation. It is not permission to install a home yourself.

Do used manufactured homes follow the same installation rules as new homes in Mississippi?

Not exactly. MH-5 treats new and used installations separately, and sets its own route for a used home whose manufacturer's instructions are not available. That does not mean every used home needs a new engineered plan.

Is a title or tax record the same as permission to place a manufactured home?

No. Title affixation and retirement through the Mississippi Department of Revenue, and county tax registration, are separate from the county or city placement permit and the state installation process.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077