Who regulates manufactured homes in Georgia?
The state licenses installers and issues installation permits. The county or city decides whether the home may go on the site. Taxes, septic and utilities are each handled separately.
| What | Who handles it | What it does not cover |
|---|---|---|
| Installer licences and installation permits | The Insurance and Safety Fire Commissioner’s office (OCI), under rule chapter 120-3-7 | County or city approval of the site |
| Placement and development | The county or city for the property | Other counties or cities |
| Tax location permits and decals | County tax offices, under Georgia Department of Revenue guidance | Installation or site approval |
| Septic, utilities and road access | County environmental health, the road authority and the utilities | Placement approval |
Modular and industrialized buildings are a separate program. A Georgia DCA memorandum of October 2025 sets out the difference, so do not apply modular rules to a HUD-code manufactured home.
Is there one permit for a manufactured home in Georgia?
No. The state installation permit, the local placement permit and the tax location permit are separate records, and finishing one does not finish the others. Depending on the property, septic approval, a driveway permit and trade permits can also apply.
How do you find the right permit office for a property?
Start from the parcel, not the mailing address. A postal city does not tell you which office has jurisdiction.
- Collect the parcel number, legal description, survey or plat, street address and ownership details.
- Confirm whether the property is inside city limits, how it is zoned, and which office issues the placement permit.
- Identify the sewer provider or septic authority, the water and electric providers, and road access.
- Note whether the home is new, pre-owned, moving from another county, a replacement or going into a park. Requirements can differ for each.
What does the State of Georgia require?
A licensed installer. Georgia’s rules allow only licensed installers to get installation permits, and a permit cannot be transferred (rule 120-3-7).
A state installation permit, in two steps.
| Step | What the rule registry says |
|---|---|
| Temporary permit | Applied for at least 48 hours before installation |
| Permanent permit | Applied for within three calendar days after the installation is completed |
| Fee | $60 for a new or pre-owned home, as listed by OCI |
| How | Through OCI’s Citizenserve system |
The $60 is the state charge only. County or city permits, septic approval and other local fees are separate.
The right installation instructions. New homes follow the manufacturer’s instructions. For a previously occupied home without its manufacturer’s instructions, the rules set an alternative route. That does not mean every used home needs its own engineered design.
What do Georgia counties ask for?
There is no statewide county checklist. Here is what three counties publish, as checked on November 17, 2026. Each office can ask for more, so confirm before you submit.
Bulloch County
Permitting and inspections. 912-489-1356.
Bulloch County screens pre-owned manufactured homes, including photos of their condition. Its online account system covers permits, payments and inspection requests, and the county describes power and occupancy release as separate steps.
For a home moving in from another county, Bulloch’s taxation page asks for the tax documents from the old county and tells owners to check zoning and permits before the move.
Carroll County
Community Development, 423 College Street. 770-830-5861.
Carroll County’s manufactured home packet asks for:
- parcel and plan review sheets
- a dimensioned sketch showing setbacks
- an erosion control affidavit
- evidence of the tax location permit
- the septic application
- notarized affidavits from the contractors
The packet describes a final inspection and a certificate of occupancy. A driveway needs its own application, with its own fee. Treatment of homes in parks differs from individual lots. These are county rules; property inside a city follows city rules.
Emanuel County
Building Inspection and Code Enforcement. 478-237-6514.
Emanuel County’s online permit packet asks for:
- for a pre-owned home, evidence of its condition, with condition, responsibility and permission letters
- the plat
- ownership and tax records
- septic records
The installer completes an affidavit separate from the applicant’s section. The county’s inspection checklist ends with a certificate of occupancy once the requirements are met. Pre-owned homes have their own standards section that does not apply to new homes.
What does a site plan need to show?
It depends on the office. Carroll County wants a dimensioned sketch with setbacks. Bulloch and Emanuel counties ask for the plat. Before drawing, get the office’s own list.
Stampd draws site plans for manufactured home placements to the receiving office’s requirements.
What happens after the home is installed?
Several things happen separately:
- The permanent state permit. The installer applies within three calendar days of completing the installation.
- Local inspections and closeout. Carroll and Emanuel counties both describe a final inspection and certificate of occupancy. Ask the county what releases power.
- Tax records. The county tax location permit or decal is handled through the county tax office.