Arizona permit guide

Manufactured home permits in Arizona

Sources last checked

Arizona has no single permit for a manufactured home. The installation permit comes from the Arizona Department of Housing's Office of Manufactured Housing (OMH), or from a local office that has an inspection service agreement with it. Zoning and site approval come separately from the county or city, along with any floodplain, wastewater and access approvals.

Get a quote for Arizona For dealers and installers

Who regulates manufactured homes in Arizona?

The state issues installation permits and licenses installers. The county or city decides whether the home may go on the site. Floodplain, wastewater and access approvals can each come from a different office.

What Who handles it What it does not cover
Installation permits and installer licences Arizona Department of Housing, Office of Manufactured Housing (OMH), or a local office with an inspection service agreement Zoning or site approval
Zoning and site development The county for unincorporated land; the city or town otherwise Installation of the home
Floodplain, wastewater and access County flood control districts and the local offices and providers for the property Other approvals
Moving homes built before June 15, 1976 Conditions in Arizona Revised Statutes 41-4048 Zoning at the new site

OMH covers both HUD-code manufactured homes and factory-built buildings, and the two have different plan packets. Make sure you use the one for a manufactured home.

Is there one permit for a manufactured home in Arizona?

No. The installation permit and the local zoning approval are separate, and other approvals can apply depending on the property: a floodplain use permit, wastewater approval, access or drainage review, and separate permits for accessory work.

Who issues the installation permit for a property?

It depends on where the property is. OMH issues installation permits, but where a city or county has an inspection service agreement (ISA) with OMH, that local office can handle them instead. These agreements change, so check the current arrangement for the property’s city or county before you apply.

OMH describes applying online through its e-Licensing system. Its website lists installation guidance updated in November 2026 and a fiscal 2027 fee schedule, so check the current notices before relying on older checklists.

How do you find the right permit office for a property?

Start from the parcel, not the mailing address. A postal city does not tell you which office has jurisdiction.

  1. Collect the parcel number, legal description, survey or plat, street address and ownership details.
  2. Confirm whether the property is inside a city or town, how it is zoned, and who issues the installation permit there.
  3. Identify the sewer or septic authority, the water and electric providers, road access and any floodplain review.
  4. Note whether the home is new, used, a replacement, built before June 15, 1976, or part of a community. Requirements can differ for each.

Watch for names that sound alike. Maricopa County is not the City of Maricopa, and Pima County is not the Town of Pima in Graham County.

What does the State of Arizona require?

The right installer licence. OMH licenses installers in different classes, each covering different work. Use an installer licensed for the job.

An installation permit. From OMH, or from the local office where an inspection service agreement applies.

Conditions for older homes. Homes built before the federal HUD Code took effect on June 15, 1976 fall under Arizona Revised Statutes 41-4048, which sets conditions for moving them, including moves into Arizona and between parks.

What do Arizona counties ask for?

There is no statewide county checklist. Here is what three counties publish, as checked on November 17, 2026. Each office can ask for more, so confirm before you submit.

Maricopa County

Maricopa County handles unincorporated land in the county. Its manufactured housing directive separates county planning and zoning review from the state installation permit.

The county’s Permit Center, launched in June 2024, handles applications, reviews, inspection requests and payments online. Its inspection services guide describes separate state and county inspections for a manufactured home, both of which affect utility clearance.

Pinal County

Flood Control District. 520-866-6411.

Pinal County sets out what a new or replacement manufactured home in a floodplain needs:

  • a county floodplain use permit, alongside the state approvals
  • foundation and elevation plans prepared by a professional
  • proof of the final elevation before utilities or occupancy are released

The floodplain use permit can be uploaded through the county’s Citizen Access portal. This applies to floodplain sites; it is not a requirement for every Arizona placement.

Pima County

Development Services. Flood questions: 520-724-4600.

Pima County reviews the placement and relocation of manufactured buildings, and flags floodplain requirements. Confirm the zoning, flood, utility and accessory requirements for the property, and who issues the installation permit there.

What does a site plan need to show?

It depends on the office and the site. A floodplain site in Pinal County needs professional foundation and elevation plans as well as a site plan. Before drawing, get the office’s own list.

Stampd draws site plans for manufactured home placements to the receiving office’s requirements.

What happens after the home is installed?

Several inspections can apply, and no single one closes out the job. In Maricopa County, both the state installation inspection and the county’s own inspections affect utility clearance. On a floodplain site in Pinal County, proof of the final elevation comes before utilities or occupancy are released. Ask each office what releases power to the home.

FAQ

Common questions

Who issues manufactured home installation permits in Arizona?

The Arizona Department of Housing's Office of Manufactured Housing (OMH). Where a city or county has an inspection service agreement (ISA) with OMH, that local office may handle installation permits instead. Check which applies to the property before applying.

Does an Arizona installation permit replace local zoning approval?

No. The installation permit and the county or city zoning and site approval are separate. Unincorporated land goes to the county; land inside a city or town goes to that municipality.

How do you apply for an OMH installation permit?

OMH describes applying online through its e-Licensing system. Check the OMH website for current notices first: it lists installation guidance updated in November 2026 and a fiscal 2027 fee schedule.

Does a manufactured home in an Arizona floodplain need extra approval?

Yes, where the county requires it. Pinal County, for example, requires a floodplain use permit for new and replacement manufactured homes in a floodplain, with foundation and elevation plans prepared by a professional, and proof of the final elevation before utilities or occupancy are released.

Is Maricopa County the same as the City of Maricopa for permits?

No. Maricopa County handles unincorporated land in the county. The City of Maricopa is a separate jurisdiction with its own office. In the same way, Pima County is not the Town of Pima in Graham County.

Can a home built before June 15, 1976 be moved in Arizona?

Only under conditions. Homes built before the federal HUD Code took effect on June 15, 1976 fall under Arizona Revised Statutes 41-4048, which sets conditions for moving them, including moves into Arizona and between parks. Check zoning separately, because local rules for these older homes can differ.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077