Who regulates manufactured homes in Louisiana?
The state licenses installers and issues installation stickers. The parish or city decides whether the home may go on the site. Flood, wastewater and utilities are each handled separately.
| What | Who handles it | What it does not cover |
|---|---|---|
| Installer licensing and installation stickers | Louisiana Manufactured Housing Commission and the Office of State Fire Marshal (OSFM), as of November 2026 | Parish or city approval of the site |
| Placement and land use | The parish or city for the property | Other parishes or cities |
| Flood, wastewater and utilities | The local floodplain office, the health department or sewer authority, and the utilities | Placement approval |
A change is coming. Act 765 of 2026 (SB 398) was signed on June 2, 2026 and takes effect on January 1, 2027. Its digest describes moving the commission’s duties and changing local installation inspection. Until then, the current rules on this page apply.
Is there one permit for a manufactured home in Louisiana?
No. The state installation sticker and the parish or city placement permit are separate, and finishing one does not finish the others. Depending on the property, flood, wastewater and utility approvals also apply. Some local forms call the installation sticker a mover’s sticker, so check which authority issues each item and what it is for.
How do you find the right permit office for a property?
Start from the parcel, not the mailing address. A postal city does not tell you which office has jurisdiction.
- Collect the parcel number, legal description, survey or plat, street address and ownership details.
- Confirm whether the property is inside city limits, how it is zoned, and which office issues the placement permit.
- Identify the sewer provider or health department, the water and electric providers, road access and the flood zone.
- Note whether the home is new, used, a replacement, a rental or part of a community. Requirements can differ for each.
What does the State of Louisiana require?
An installation sticker. RS 51:912.27 requires an installation sticker for each home, listed at $20. The sticker is ordered from OSFM on its sticker application. It is a state charge, not the cost of the project.
A licensed installer, or a qualifying homeowner. The same statute separates licensed installer and transporter roles, and has a narrow exception that lets a homeowner install their own home under its conditions. A park operator leasing homes does not count as a homeowner.
The right installation instructions. New HUD-code homes follow the manufacturer’s instructions. A used home without its instructions follows the fallback set in RS 51:912.22. Modular homes are covered separately, so do not use one checklist for both.
The state forms. OSFM’s forms page has separate forms for the installation contract, site preparation for new and used homes, and homeowner installations. Licensees file monthly reports, including for months with no installations.
What do Louisiana parishes ask for?
There is no statewide parish checklist. Here is what three parishes publish, as checked on November 17, 2026. Each office can ask for more, so confirm before you submit.
Lafourche Parish
Permits and Planning, 4876 LA-1. 985-537-7603.
Lafourche Parish’s checklist, revised March 2026, asks for:
- the address
- flood evidence for the property
- Wind Zone 3 data for the home
- a site plan
- proof of ownership
- health department or sewer approval
- placement and tie-down affidavits
Before release, the parish checks the final elevation, the plumbing, electrical and mechanical work, and the installation sticker. Permits can be applied for online through MyPermitsNow, linked from the parish’s permits page.
Livingston Parish
Building and Permit, 20399 Government Blvd. Parish: 225-686-2266.
Livingston Parish lists application forms for new and used manufactured homes, along with zoning and flood determinations, and an online permit route through MGO Connect. Livingston Parish is not the Town of Livingston.
Tangipahoa Parish
Permit Office: Hammond 985-542-2117, Amite 985-748-2024.
Tangipahoa Parish’s building permit process calls for an address, a survey or deed, a flood determination and sewer approval. Its online permit system on MyGovernmentOnline takes PDF uploads, fees, comments and inspection requests. Ask for the parish’s manufactured home checklist, because the general process page is not specific to manufactured homes.
What does a site plan need to show?
It depends on the parish. Lafourche Parish wants a site plan alongside flood evidence and Wind Zone 3 data, and checks the final elevation before release. Before drawing, get the office’s own list.
Stampd draws site plans for manufactured home placements to the receiving office’s requirements.
What happens after the home is installed?
Several things happen separately:
- Local inspections and release. In Lafourche Parish, the final elevation, trade work and installation sticker are checked before release. Ask each parish what releases power.
- State reports. Licensees file their monthly reports with OSFM.
- After January 1, 2027. Check for changes under Act 765, which changes local installation inspection.