South Carolina permit guide

Manufactured home permits in South Carolina

Sources last checked

In South Carolina, the setup permit for a manufactured home comes from the county or city. The Manufactured Housing Board at the Department of Labor, Licensing and Regulation (LLR) licenses installers and sets installation standards, but a state licence does not replace the local permit. Zoning, septic, road access and the county tax decal are separate steps.

new manufactured homes shipped to South Carolina in 2025
5,232
most that can be charged for an installation inspection (SC Code 40-29-350)
$100
Get a quote for South Carolina For dealers and installers

Who regulates manufactured homes in South Carolina?

The state licenses installers and sets installation standards. The county or city issues the setup permit and handles zoning. Tax decals, septic and road access are each handled separately.

What Who handles it What it does not cover
Installer, repairer and contractor licences; installation standards LLR Manufactured Housing Board, under Title 40, Chapter 29 and Regulation 79 The local setup permit
Setup permits, zoning and inspection The county or city for the property Other jurisdictions
Home licence or decal, and moving The county licensing agent, under Title 31, Chapter 17 Placement approval
Septic, flood and road access SC Department of Environmental Services (SCDES), the floodplain and road offices, and the providers The setup permit

LLR’s forms page notes that a state licence does not replace local licensing or permitting. Septic permits now go through SCDES; older county forms may still say DHEC.

Is there one permit for a manufactured home in South Carolina?

No. The local setup permit, zoning approval, the county decal, septic approval and any road encroachment or flood documents are separate. Finishing one does not finish the others.

How do you find the right permit office for a property?

Start from the parcel, not the mailing address. A postal city does not tell you which office has jurisdiction.

  1. Collect the parcel number, legal description, survey or plat, street address and ownership details.
  2. Confirm whether the property is inside a city, how it is zoned, and which office issues the setup permit.
  3. Identify the sewer provider or septic route, the water and electric providers, road access and the flood zone.
  4. Note whether the home is new, used, moving within the county, a replacement, a repossession or a trade-in. Requirements can differ for each.

What does South Carolina require?

A licensed, bonded installer. LLR says installers must be licensed and bonded, and a licence cannot be lent to someone else. Regulation 79 separates installer, repairer and contractor licences, so check the licence covers the work.

The right installation instructions. Regulation 79-42 sets out the manufacturer’s instructions for new homes and separate standards for used homes. Read the exact section before relying on an alternative for a home without its manual.

A limit on the installation inspection fee. SC Code section 40-29-350 sets a maximum of $100 for an installation inspection. That limits one fee, not every charge on a project. Zoning, impact, registration and other local charges are classified separately.

A county licence or decal, and moving rules. Title 31, Chapter 17 covers the county licence or decal and moving a home, with exceptions for dealers. This is a tax record, not approval to place the home.

Septic approval where there is no public sewer. A manufactured home site without public sewer needs a septic permit through SCDES.

What do South Carolina counties ask for?

There is no statewide county checklist. Here is what three counties publish, as checked on November 17, 2026. Each office can ask for more, so confirm before you submit.

Horry County

Code Enforcement, 1301 Second Avenue, Conway. 843-915-5090.

Horry County Code Enforcement covers unincorporated county land. Its requirements packet asks for:

  • the address
  • the tax sticker
  • a scaled site plan
  • wastewater evidence
  • wind zone verification for the home
  • the manufactured home installer or contractor named on the permit
  • signed owner and qualifier authorization forms

Horry County adopted a new planning fee schedule effective July 1, 2026, and its impact fees were updated in 2026. Ask for a current quote instead of using the figures in the older packet.

Berkeley County

Permitting, 1003 Highway 52, Moncks Corner. 843-719-4292.

Berkeley County’s online application first checks that the address is within the county’s permitting jurisdiction. It asks for:

  • the title or Form 400
  • ownership, tax and moving records
  • a site plan
  • septic or sewer evidence
  • road encroachment evidence

Where the property is in a flood zone, a final elevation document comes before the final inspection and power release. The applicant is responsible for requesting inspections. The county’s information page sets out different routes for new and used homes, moves within the county, homes leaving the county, repossessions and trade-ins.

Jasper County

Building Department, 358 Third Avenue, Ridgeland. 843-717-3650.

Jasper County’s checklist, revised January 14, 2026, asks for:

  • a site plan
  • the address
  • the title or bill of sale
  • wastewater approval
  • wind zone evidence for the home
  • the licensed contractors’ details
  • for a used home, evidence of habitability and photos

Apply online for zoning first, then for the manufactured home permit. The home must be unskirted at inspection, and skirting is finished after the final inspection within the period the county sets. A flood certificate is needed where the property is in a flood zone.

What does a site plan need to show?

It depends on the office. Horry County wants a scaled site plan, drawn to an engineer’s scale; that describes the drawing scale and does not by itself call for an engineer’s seal. Berkeley and Jasper counties both ask for a site plan with their applications. Before drawing, get the office’s own list.

Stampd draws site plans for manufactured home placements to the receiving office’s requirements.

What happens after the home is installed?

Several things happen separately:

  1. Inspections. Keep exposed whatever the county needs to see. In Jasper County, that means no skirting until after the final inspection.
  2. Flood and power. In Berkeley County, the final elevation document comes before the final inspection and power release on a flood-zone site.
  3. Records. The county decal and tax records are handled by the county licensing agent.

FAQ

Common questions

Who issues the manufactured home setup permit in South Carolina?

The county or city where the home is going. The LLR Manufactured Housing Board licenses installers and sets installation standards, and LLR notes that a state licence does not replace local licensing or permitting.

Do manufactured home installers need a licence in South Carolina?

Yes. LLR says installers must be licensed and bonded, and a licence cannot be lent to someone else. Regulation 79 separates installer, repairer and contractor licences, each with its own scope.

How much is the manufactured home installation inspection fee in South Carolina?

SC Code section 40-29-350 sets a maximum of $100 for an installation inspection. That limits one fee only. Zoning, impact, registration and other local charges are separate.

Do new and used manufactured homes follow the same installation rules in South Carolina?

No. Regulation 79-42 sets out the manufacturer's instructions for new homes and separate standards for used homes. Counties can also ask for more for used homes: Jasper County asks for evidence of habitability and photos.

Should a manufactured home be skirted before inspection in South Carolina?

It depends on the county. Jasper County's checklist says the home must be unskirted at inspection, with skirting finished after the final inspection within the period the county sets. Ask each county what must stay visible.

Does the county tax decal approve the placement of a manufactured home?

No. The county licence or decal, handled by the county licensing agent under Title 31, Chapter 17, is a tax record with its own exceptions for dealers. The setup permit and zoning approval are separate.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077