Who issues the permit in Burnet County?
Burnet County Development Services handles 911 addressing, building and development permits, septic permits and floodplain development.
Development Services, 133 E. Jackson Street, Room 107, Annex on the Square, Burnet, TX 78611. 512-715-5260. Monday to Friday, 8 am to 5 pm. Mailing address: 220 S Pierce Street, Burnet, TX 78611.
The county’s page links an LCRA jurisdiction map, so near the Highland Lakes check whether LCRA handles the septic permit instead.
What order do the permits go in?
- 911 address. Apply for a 911 address for any new residence before applying for any permit.
- Building permit. Needed before a septic permit can be issued.
- Septic (OSSF) permit. Usually submitted by the licensed septic installer.
Incomplete packets are not accepted or processed. The building and septic applications can go in the same envelope or email.
How much is the building permit?
Both classes use the same one-page application.
| Class | Where | Fee | What it needs |
|---|---|---|---|
| A | Outside any flood hazard area | $25 | The application and payment. No structure inspections |
| B | Inside a designated flood hazard boundary | $400 | The application, payment, an elevation certificate from a surveyor or a letter from an engineer, and/or a site plan showing the flood zone |
Call 512-756-5445 to check whether the property is in a flood hazard area. Pay by check to Burnet County, or by card with a transaction fee.
What does the septic permit need?
- the septic/OSSF application
- a site evaluation by a licensed site evaluator, which decides what type of system the property can take
- a drawing or design of the proposed system
- any affidavits or maintenance contracts the system type needs
| System | Fee |
|---|---|
| Most systems | $250 |
| Aerobic | $400 |
Fees are non-refundable.
What changes in a flood hazard area?
Any work in a designated flood hazard area needs a development permit. The application comes with a site plan detailing all proposed development and a pre-construction elevation certificate. The county inspects before the pour and when construction is finished, and asks owners to visit the floodplain manager before and during planning.
What does the state require in Burnet County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
In a flood zone, Burnet County accepts a site plan showing the flood zone with the Class B permit, and floodplain development needs a site plan of all proposed development. Show the home, the septic system and its field, any well, the driveway, the property lines and the flood zone boundary. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.