Gonzales County, Texas

Manufactured home permits in Gonzales County, Texas

Sources last checked

In unincorporated Gonzales County, the Office of Emergency Management and Permits in Gonzales handles septic, driveway and floodplain permits. A manufactured home on its own septic system needs a septic permit ($310 conventional, $410 aerobic or engineered), and the application needs an approved 911 address and a driveway permit ($50 for a manufactured home). In the floodplain, a $100 residential floodplain permit must be approved before the septic permit.

manufactured homes installed in Gonzales County in 2025 (TDHCA installation records)
70
Gonzales County septic permit for a conventional system; $410 aerobic or engineered
$310
Gonzales County residential driveway permit, including a manufactured home, needed before the septic permit
$50
Get a quote for Gonzales County For dealers and installers

Who issues the permit in Gonzales County?

For property outside city limits, the Gonzales County Office of Emergency Management and Permits.

Office of Emergency Management and Permits, 1811 Water Street, Gonzales, TX 78629. 830-672-6209. Monday to Friday, 7:30 am to 4:30 pm.

It handles septic, driveway, floodplain, subdivision and waterline permits. The 911 address comes from the Golden Crescent Regional Planning Commission.

Step 1: the driveway permit

A driveway permit is part of the septic application, so it comes first. It is needed for:

  • a new driveway onto a county road
  • a new culvert, paving a dirt driveway, or widening
  • any work in the county right-of-way, from the road to the fence
Driveway Fee
Residential: home, cabin, manufactured home or other single-family residence $50
Manufactured home or RV park $400

Bring the application, a map of where the driveway meets the county road and the fee to the permit office. No driveway work may start before the permit is issued. Culverts the county requires are furnished and installed by the applicant. On a state highway, the driveway permit comes from TxDOT.

Step 2: the septic permit

The county issues a septic permit after a site evaluation shows the soil type and what system the site can take. Submit:

  1. the completed septic application
  2. the site evaluation report (site evaluator, registered sanitarian or engineer)
  3. an approved 911 address
  4. the abstract card from the Gonzales County Appraisal District
  5. proof of ownership, if different from the abstract card
  6. for aerobic systems, the septic affidavit and a maintenance contract
  7. the driveway permit

An engineer or registered sanitarian must design the system if the soil is Type Ia or Type IV, the site is in the floodplain, the subdivision requires engineered systems, or TCEQ rules require it.

System Fee
Conventional $310
Aerobic or engineered $410
Commercial or industrial $510

Allow five to seven working days. The application expires one year after the license to construct.

Is a floodplain permit needed?

For development in the floodplain, yes. The residential fee is $100 ($350 commercial), approval takes five to seven business days, and the permit is good for one year.

  • A construction elevation certificate is due with the application, and a finished construction certificate after the home is complete.
  • Only parking, access and storage may sit below the base flood elevation, and all mechanical, electrical and plumbing parts must be above it.
  • In the 100-year floodplain, the septic permit waits until the development permit for the home is approved.

What does the state require in Gonzales County?

The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.

What should the site plan show?

The septic review, the driveway map and any floodplain permit all depend on where things sit on the lot. Show the home, the septic system and its field, any well, the driveway where it meets the county road, the property lines and any part of the lot in the floodplain. Stampd draws site plans for manufactured home placements.

More help with Texas placements

The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.

FAQ

Common questions

Who issues manufactured home permits in Gonzales County, Texas?

The Gonzales County Office of Emergency Management and Permits, 1811 Water Street, Gonzales, TX 78629 (830-672-6209), Monday to Friday 7:30 am to 4:30 pm. It handles septic, driveway, floodplain, subdivision and other county permits.

What does a Gonzales County septic application need?

A completed septic application, a site evaluation report by a site evaluator, registered sanitarian or engineer, an approved 911 address from the Golden Crescent Regional Planning Commission, the abstract card from the Gonzales County Appraisal District, proof of ownership if different from the abstract card, a driveway permit from the county or TxDOT, and for aerobic systems a septic affidavit and maintenance contract. Review takes five to seven working days.

When must an engineer design the septic system in Gonzales County?

When the site evaluation finds Type Ia or Type IV soil, the site is in the floodplain, the subdivision is restricted to engineered systems, or TCEQ's Chapter 285 rules require it. In those cases a professional engineer or registered sanitarian designs the system.

Is a driveway permit needed for a manufactured home in Gonzales County?

Yes, for a new driveway on a county road, a new culvert, paving a dirt driveway, widening, or any work in the county right-of-way. The residential fee, including a manufactured home, is $50. The application needs a map of where the driveway meets the county road, and no driveway work may start before the permit is issued. Culverts the county requires are furnished and installed by the applicant.

When is a floodplain permit needed in Gonzales County?

For development in the floodplain in unincorporated Gonzales County. The residential fee is $100 and the permit is good for one year. A construction elevation certificate is due with the application and a finished construction certificate after the home is complete. No living area, and no mechanical, electrical or plumbing parts, may sit below the base flood elevation. In the 100-year floodplain, the septic permit is not issued until the development permit is approved.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Sources

Every fact on this page comes from one of these, checked on November 23, 2026. Rules and fees change; confirm with the office before you submit. This page is general information, not legal advice.

  1. Gonzales County, County Permits
  2. Gonzales County, Septic Permit Checklist and Application
  3. Gonzales County, Driveway Permit Checklist (June 2025)
  4. Gonzales County, Floodplain Development Permit Application
  5. TDHCA, Manufactured Housing installation records Installations reported in Gonzales County, January to December 2025

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077