Who issues the permit in Comal County?
For unincorporated land, the Comal County Engineer’s Office handles septic, floodplain and driveway permits.
195 David Jonas Drive, New Braunfels, TX 78132. 830-608-2090. 8 am to 4:30 pm. Apply in person or through the online permit portal.
The county notes that property owners’ associations, cities, utilities and state and federal agencies may have their own requirements.
How does the septic permit work?
- Site and soil evaluation by a qualified site evaluator, who also locates structures with required separation distances.
- Design by a registered engineer or sanitarian, certifying that it meets state rules.
- Application in the property owner’s name, with the OSSF Development Application Checklist.
- Review. The Engineer’s Office decides whether the site is in the regulatory floodplain and checks compliance with the county subdivision regulations.
- Authorization to construct. It can be withheld if information is missing or contradictory, a required floodplain development permit has not been issued, or the property breaks the subdivision rules.
- Three inspections during installation, each booked at least 24 hours ahead. A failed or not-ready inspection costs the installer $150.
- License to operate after all inspections pass.
When is a professional design required?
The county’s septic steps list cases that need a registered engineer or sanitarian, including:
- all systems in the Edwards Aquifer recharge zone
- lots under 1 acre on a private well, or under half an acre on public water, and lots platted after January 1, 1988
- non-standard systems and systems needing variances
- systems serving rented manufactured home communities or RV parks
Driveways
A driveway installed or modified in the public right-of-way needs a PIPROW (Private Improvement within the Public Right-of-Way) permit from the Engineer’s Office.
What does the state require in Comal County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
In Comal County, the septic design, the floodplain determination and the subdivision check all rely on the layout. Show the home, the septic system and its field, any well, the driveway in the right-of-way, the property lines and the floodplain boundary. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.