Who issues the permit in DeWitt County?
| What | Office | Phone |
|---|---|---|
| Floodplain development permit, driveway permit | DeWitt County Judge’s Office, 307 N. Gonzales, Cuero, TX 77954 | 361-275-0916 |
| Septic (OSSF), $130 permit | Victoria County Health Department, 2805 N. Navarro, Victoria, TX 77901 | 361-578-6281, ext. 3409 |
| 911 address | Golden Crescent Regional Planning Commission | 361-578-1587 |
| Driveway on a state highway | TxDOT, Cuero | 361-275-3821 |
DeWitt County requires no building permit outside city limits.
What are the floodplain fees?
The Floodplain Administration decides whether the home site is inside the special flood hazard area:
| Where the home goes | What you get | Fee |
|---|---|---|
| Outside the flood zone | Permit package: information (exemption) letter, development permit and utility permit | $20 |
| Outside the flood zone, FIRMette and letter only | Informational | $10 |
| Inside the flood zone | Floodplain development permit for placement of a manufactured home | $200 |
| Extra engineering review, if needed | Per hour | $250 |
In Zone B or shaded Zone X, a floodplain development permit is required only for critical facilities.
What does the floodplain permit need?
- a site plan and maps of the development
- an elevation certificate for each structure, by a licensed surveyor or registered engineer
- the base flood elevation and the proposed lowest floor and utility elevations
- a no-rise certificate in a regulatory floodway (mandatory)
Driveways
A driveway permit is required when the entrance is on a county road and needs a 911 address. The precinct commissioner inspects the work. The permit is void if the driveway is not built within 90 days. Call Texas811 (Dig-Tess) before digging.
What does the state require in DeWitt County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
The floodplain permit asks for a site plan whether or not the home is in the flood zone. Show the home, the flood zone boundary, the septic system and its field, any well, the driveway onto the county road and the property lines. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.