Travis County, Texas

Manufactured home permits in Travis County, Texas

Sources last checked

Outside city limits, Travis County Development Services issues a Single Family Home / Manufactured Home development permit, applied for online with the septic and driveway permits where needed. The package needs a site plan with contour lines, improvements, septic and easements, and an erosion and sediment control plan. Lots in or partly in a floodplain need more, including an elevation certificate after completion.

manufactured homes installed in Travis County in 2025 (TDHCA installation records)
247
third-party construction inspections required for manufactured homes (site-built homes need three)
0
after completion to file a finished-construction elevation certificate for a home in the floodplain
30 days
Get a quote for Travis County For dealers and installers

Who issues the permit in Travis County?

For property outside city limits, Travis County Development Services (part of Transportation & Natural Resources) issues the residential development permit, with septic and driveway permits in the same online application where they apply.

Permit desk: 700 Lavaca, Suite 540, Austin, TX 78701. 512-854-4215. Monday to Thursday, 9:00 am to 2:00 pm.

Check the parcel on the county’s Jurisdiction Web Map first. A property inside Austin or another city follows that city’s rules.

What does the application ask for?

Information Notes
Address
Legal description From the Travis Central Appraisal District: lot, block, phase and section
Property ID
ETJ name If the property is in a city’s extraterritorial jurisdiction
Proposed start date and estimated cost
Septic Whether the home uses an on-site sewage facility
Code year Statement of the International Residential Code year

When applying online, pick the application type that matches the job: Residential Development, Residential Development and On-Site Wastewater, or Residential Development, Driveway, and On-Site Wastewater. The checklist questions are built into the application.

What documents does Travis County need?

Site plan, showing:

  • contour lines
  • all existing and proposed improvements
  • the existing or proposed septic system, if any
  • all easements: drainage, public utility, electrical, non-disturbance and others

Erosion and sediment control plan, showing:

  • all proposed grading
  • waterways or critical environmental features
  • the existing or proposed septic system, if any

A stormwater pollution prevention plan is added where it applies.

What changes in a floodplain?

For a lot fully or partly in the floodplain, add:

  • a full set of architectural plans
  • a site plan showing the floodplain and the lowest floor elevation of every existing and proposed structure
  • a flood venting plan and a balance of fill statement, where they apply
  • an elevation certificate based on finished construction, within 30 days of completion

Travis County requires no effect on the base flood elevation or on the floodplain’s conveyance.

Inspections and posting

  • The permit must be posted where it is visible from the public right-of-way before work begins.
  • Site-built homes by professional builders need three third-party inspections. Inspections are not required for manufactured homes.

What does the state require in Travis County?

The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.

What should the site plan show?

Travis County asks for more than most Texas counties: contours, every improvement, the septic system, every easement, and a separate erosion and sediment control plan, plus floodplain and floor elevations where they apply. Stampd draws site plans for manufactured home placements to the county’s checklist.

More help with Texas placements

The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.

FAQ

Common questions

Does a manufactured home need a permit in unincorporated Travis County?

Yes. Travis County Development Services issues a Single Family Home / Manufactured Home permit for development outside city limits. Applications are filed online, choosing Residential Development, Residential Development and On-Site Wastewater, or Residential Development, Driveway, and On-Site Wastewater. The permit desk is at 700 Lavaca, Suite 540, Austin, TX 78701 (512-854-4215).

What must a Travis County site plan show?

Contour lines, all existing and proposed improvements, the location of any existing or proposed septic system, and all easements, such as drainage, public utility, electrical and non-disturbance easements. A separate erosion and sediment control plan shows all proposed grading, waterways or critical environmental features, and the septic location.

What information does the Travis County application ask for?

The address, the legal description from the Travis Central Appraisal District (lot, block, phase and section), the property ID, the ETJ name if any, the proposed start date, the estimated cost, whether the home uses a septic system, and a statement of the International Residential Code year.

What extra documents does Travis County need in a floodplain?

For a lot fully or partly in the floodplain: a full set of architectural plans; a site plan showing the floodplain and the lowest floor elevation of all existing and proposed structures; a flood venting plan and a balance of fill statement where they apply; and an elevation certificate based on finished construction within 30 days of completion. Travis County requires no effect on the base flood elevation or the floodplain's conveyance.

Are inspections required for a manufactured home in Travis County?

Not the construction inspections. Travis County requires three third-party inspections for site-built homes by professional builders, but says inspections are not required for manufactured homes. The permit must be posted where it is visible from the public right-of-way before work begins.

How do I know if my property is in Travis County's jurisdiction?

Use the county's Jurisdiction Web Map to check which city and county the property is in. The county permit covers development outside corporate city limits; a property inside Austin or another city follows that city's rules.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Sources

Every fact on this page comes from one of these, checked on November 23, 2026. Rules and fees change; confirm with the office before you submit. This page is general information, not legal advice.

  1. Travis County Development Services, Single Family Home / Manufactured Home Permit
  2. Travis County Development Services, Apply for a Permit
  3. TDHCA, Manufactured Housing installation records Installations reported in Travis County, January to December 2025

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077