Who issues the permit in Travis County?
For property outside city limits, Travis County Development Services (part of Transportation & Natural Resources) issues the residential development permit, with septic and driveway permits in the same online application where they apply.
Permit desk: 700 Lavaca, Suite 540, Austin, TX 78701. 512-854-4215. Monday to Thursday, 9:00 am to 2:00 pm.
Check the parcel on the county’s Jurisdiction Web Map first. A property inside Austin or another city follows that city’s rules.
What does the application ask for?
| Information | Notes |
|---|---|
| Address | |
| Legal description | From the Travis Central Appraisal District: lot, block, phase and section |
| Property ID | |
| ETJ name | If the property is in a city’s extraterritorial jurisdiction |
| Proposed start date and estimated cost | |
| Septic | Whether the home uses an on-site sewage facility |
| Code year | Statement of the International Residential Code year |
When applying online, pick the application type that matches the job: Residential Development, Residential Development and On-Site Wastewater, or Residential Development, Driveway, and On-Site Wastewater. The checklist questions are built into the application.
What documents does Travis County need?
Site plan, showing:
- contour lines
- all existing and proposed improvements
- the existing or proposed septic system, if any
- all easements: drainage, public utility, electrical, non-disturbance and others
Erosion and sediment control plan, showing:
- all proposed grading
- waterways or critical environmental features
- the existing or proposed septic system, if any
A stormwater pollution prevention plan is added where it applies.
What changes in a floodplain?
For a lot fully or partly in the floodplain, add:
- a full set of architectural plans
- a site plan showing the floodplain and the lowest floor elevation of every existing and proposed structure
- a flood venting plan and a balance of fill statement, where they apply
- an elevation certificate based on finished construction, within 30 days of completion
Travis County requires no effect on the base flood elevation or on the floodplain’s conveyance.
Inspections and posting
- The permit must be posted where it is visible from the public right-of-way before work begins.
- Site-built homes by professional builders need three third-party inspections. Inspections are not required for manufactured homes.
What does the state require in Travis County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
Travis County asks for more than most Texas counties: contours, every improvement, the septic system, every easement, and a separate erosion and sediment control plan, plus floodplain and floor elevations where they apply. Stampd draws site plans for manufactured home placements to the county’s checklist.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.