Who issues the permit in Polk County?
For property outside city limits, the Polk County Permit Department issues development permits, septic permits and 911 addresses.
Permit Department, 602 E Church Street, Suite 141, Livingston, TX 77351. 936-327-6820 ext. 1. Monday to Friday, 8:00 am to 4:00 pm.
Since October 22, 2024, development and septic permits must be obtained at the same time, on the county’s combined Residential Development, Septic and 911 Address permit form.
Inside Livingston, Corrigan, Onalaska or Goodrich city limits, the development permit comes from that city hall.
Which permits does a placement need?
| Permit | When | Fee |
|---|---|---|
| Residential development | Before placing any structure, and to get electric service. Valid two years | $150 |
| Septic (OSSF) | Every residence without sewer. Fee waived for the first residence on 10 acres or more | $300 residential |
| 911 address | Each residence on a parcel needs its own; needed for electric service | $35 |
| Aerobic maintenance | Annual administrative fee per aerobic system | $15 |
Fees from the schedule effective October 1, 2024. Starting work without permits leads to administrative fees, court fees or fines, charged to the owner and/or the builder.
What about septic?
Polk County enforces state standards for installing or modifying a septic system, and all septic plans go to the Permit Department for approval.
Aerobic systems must be inspected at least three times a year by a TCEQ-registered maintenance provider, with inspection reports filed with the county. Owners can maintain their own system after taking the county’s training course.
What changes in the floodplain?
An elevation certificate is required before permits can be purchased for building in the floodplain. Check the parcel on FEMA’s flood map service before applying.
What does the state require in Polk County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
Because Polk County reviews development and septic together, one site plan should carry both: the home, the septic system and field, any well, the driveway and the floodplain boundary, with distances to the property lines. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.