Ector County, Texas

Manufactured home permits in Ector County, Texas

Sources last checked

In unincorporated Ector County, a manufactured home needs a Development Structure permit and a Drive Approach permit from Ector County Development Services, plus a septic permit where there is no sewer. The structure and drive approach permits are free. The application needs a valid address, a site plan with the home, septic and water well dimensioned from each other, and the septic permit number.

manufactured homes installed in Ector County in 2025 (TDHCA installation records)
399
for an Ector County Development Structure or Drive Approach permit; residential septic applications are $250
$0
that a Development Structure permit stays valid
6 months
Get a quote for Ector County For dealers and installers

Who issues the permit in Ector County?

For property outside city limits, Ector County Development Services issues the permits.

Development Services, 1010 East 8th Street, Suite 114, Odessa. 432-498-4241.

Ector County requires a Development Structure permit and a Drive Approach permit for dwellings in unincorporated areas, and a septic permit where there is no sewer. The county does not issue certificates of occupancy. Permits are submitted through the county’s online Permit Request Portal; the office can help by phone or email.

A property inside Odessa or another city follows that city’s rules.

Which permits does a placement need?

Permit What it is for Fee Valid for
Development Structure Makes sure the structure is at or above 1 ft of the crown of the road None 6 months
Drive Approach Makes sure the driveway connects to the county road properly None 6 months
Right-of-Way Work inside a county road right-of-way None 6 months
Septic A legal, working septic system $250 residential, $450 commercial 1 year from the Authorization to Construct

What does the Development Structure permit need?

The county’s checklist on the permit form:

  • Valid address. Use the county’s address request form, or call 432-498-4241.
  • Site plan. For a residence: the home, the septic system and the water well inside the property lines, with dimensions from each other.
  • Septic permit number.
  • ECUD permit number, when connecting to Ector County Utility District water (432-381-5525).
  • Elevation certificate, if the property is in a flood zone. The county says these come from an engineering company and publishes a list of consultants.

The form itself asks for the subdivision, section, block, lot, acreage, address, estimated cost, whether the septic is new or existing, and whether water comes from a private well or a utility district. An inspector will ask for proof of the permit on site.

What about septic?

Ector County Development Services reviews septic applications. A TCEQ-licensed site evaluator or professional engineer does the site and soil evaluation; the site plan and system design go in with the application. No septic work can start until a Designated Representative has reviewed the application and an Authorization to Construct is issued.

The installer gives at least three working days’ notice before the system is ready for inspection, and the system is inspected before it is covered. After it passes, the county issues the written approval to put it into service.

When are inspections?

  • When a manufactured home is set.
  • For a drive approach: a preliminary inspection, then a second once the forms are set.
  • Book with Development Services at 432-498-4241. Septic inspections go through the county’s Designated Representative.

What does the state require in Ector County?

The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.

What should the site plan show?

Ector County’s own example shows exactly what it expects for a residence: the lot dimensions, the home’s footprint, the septic field and the water well, each dimensioned from the others and from the property lines, plus the driveway onto the road. Stampd draws site plans for manufactured home placements to the county’s checklist.

More help with Texas placements

The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.

FAQ

Common questions

Does a manufactured home need a permit in Ector County, Texas?

Yes, outside city limits. Ector County Development Services, 1010 East 8th Street, Suite 114, Odessa (432-498-4241), issues a Development Structure permit and a Drive Approach permit. Manufactured Home is a box on the structure permit form. A septic permit is also needed unless there is an existing legal system. Ector County does not issue certificates of occupancy.

How much does an Ector County manufactured home permit cost?

The county says there is no charge for a Development Structure, Drive Approach, right-of-way or cell tower permit. Septic applications are $250 for residential and $450 for commercial.

What does the Ector County Development Structure permit need?

A valid address (request one from Development Services if needed), a site plan, the septic permit number, an Ector County Utility District permit number if connecting to ECUD water, and an elevation certificate if the property is in a flood zone. Permits are submitted through the county's online Permit Request Portal.

What must an Ector County residential site plan show?

The location of the home, the septic system and the water well within the property lines, with dimensions from each other. The county's structure permit form includes an example residential site plan showing the lot dimensions, the distances between the well, septic field and home, and the driveway.

When is a manufactured home inspected in Ector County?

The county says an inspection is required when a manufactured home is set. Drive approaches get a preliminary inspection and a second inspection once the forms are set. Inspections are booked with Development Services at 432-498-4241.

How long are Ector County permits valid?

Development Structure, Drive Approach, right-of-way and cell tower permits are valid for six months. A septic application is valid for one year from the day the Authorization to Construct is issued.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Sources

Every fact on this page comes from one of these, checked on November 23, 2026. Rules and fees change; confirm with the office before you submit. This page is general information, not legal advice.

  1. Ector County Development Services
  2. Ector County, Development Structure Permit and requirements, with example residential site plan
  3. Ector County Development Services, The Homeowner Installation Process (septic)
  4. TDHCA, Manufactured Housing installation records Installations reported in Ector County, January to December 2025

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077