Who issues the permit in Ector County?
For property outside city limits, Ector County Development Services issues the permits.
Development Services, 1010 East 8th Street, Suite 114, Odessa. 432-498-4241.
Ector County requires a Development Structure permit and a Drive Approach permit for dwellings in unincorporated areas, and a septic permit where there is no sewer. The county does not issue certificates of occupancy. Permits are submitted through the county’s online Permit Request Portal; the office can help by phone or email.
A property inside Odessa or another city follows that city’s rules.
Which permits does a placement need?
| Permit | What it is for | Fee | Valid for |
|---|---|---|---|
| Development Structure | Makes sure the structure is at or above 1 ft of the crown of the road | None | 6 months |
| Drive Approach | Makes sure the driveway connects to the county road properly | None | 6 months |
| Right-of-Way | Work inside a county road right-of-way | None | 6 months |
| Septic | A legal, working septic system | $250 residential, $450 commercial | 1 year from the Authorization to Construct |
What does the Development Structure permit need?
The county’s checklist on the permit form:
- Valid address. Use the county’s address request form, or call 432-498-4241.
- Site plan. For a residence: the home, the septic system and the water well inside the property lines, with dimensions from each other.
- Septic permit number.
- ECUD permit number, when connecting to Ector County Utility District water (432-381-5525).
- Elevation certificate, if the property is in a flood zone. The county says these come from an engineering company and publishes a list of consultants.
The form itself asks for the subdivision, section, block, lot, acreage, address, estimated cost, whether the septic is new or existing, and whether water comes from a private well or a utility district. An inspector will ask for proof of the permit on site.
What about septic?
Ector County Development Services reviews septic applications. A TCEQ-licensed site evaluator or professional engineer does the site and soil evaluation; the site plan and system design go in with the application. No septic work can start until a Designated Representative has reviewed the application and an Authorization to Construct is issued.
The installer gives at least three working days’ notice before the system is ready for inspection, and the system is inspected before it is covered. After it passes, the county issues the written approval to put it into service.
When are inspections?
- When a manufactured home is set.
- For a drive approach: a preliminary inspection, then a second once the forms are set.
- Book with Development Services at 432-498-4241. Septic inspections go through the county’s Designated Representative.
What does the state require in Ector County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
Ector County’s own example shows exactly what it expects for a residence: the lot dimensions, the home’s footprint, the septic field and the water well, each dimensioned from the others and from the property lines, plus the driveway onto the road. Stampd draws site plans for manufactured home placements to the county’s checklist.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.