Kerr County, Texas

Manufactured home permits in Kerr County, Texas

Sources last checked

Since August 7, 2026, Kerr County requires a permit for every new septic system regardless of tract size, so the ten-acre exemption no longer covers new homes. Kerr County Environmental Health in Kerrville issues the OSSF development permit: $250 for a standard system under 500 gallons a day, $300 if it needs a maintenance contract, including the $10 state fee. The application lists manufactured homes and needs proof of ownership, the legal description and a 911 address.

manufactured homes installed in Kerr County in 2025 (TDHCA installation records)
61
every new septic system in Kerr County needs a permit since August 7, 2026, regardless of tract size
Any size
Kerr County OSSF development permit for a new system under 500 gallons a day, including the $10 state fee; $300 with a maintenance contract
$250
Get a quote for Kerr County For dealers and installers

Who issues the permit in Kerr County?

Kerr County Environmental Health, the TCEQ authorized agent for septic systems in the county.

Kerr County Environmental Health, 550 Earl Garrett Street, Suite 100, Kerrville, TX 78028. 830-896-9020. Monday to Friday, 8 am to noon and 1 to 5 pm.

For flood zones, the Kerr County Engineering Department: 830-896-9046.

What changed in 2026?

The Commissioners Court approved a new septic order on July 13, and since August 7, 2026 Kerr County requires a permit for every new septic system, regardless of tract size.

It is not retroactive. An existing system on a tract of 10 acres or more stays grandfathered if it serves only one single-family home, keeps all sewage on the property and causes no nuisance. Adding another dwelling, or a new or upgraded system, needs a permit.

What are the septic fees?

Permit Under 500 gallons a day Over 500 gallons a day
New or upgraded system $240 + $10 state fee = $250 $490 + $10 = $500
New or upgraded, needing a maintenance contract (such as aerobic) $290 + $10 = $300 $590 + $10 = $600
Alter or repair a permitted system $100 $200
Extra inspection, document revision, affidavit recording $25 each $25 each

What does the application need?

The application cannot be processed until the fee is paid and these are in:

  1. Proof of ownership: warranty deed, contract for deed, or the appraisal district property ID.
  2. Legal description: the recorded plat, or metes and bounds if not platted.
  3. The 911 physical address.
  4. Detailed directions to the site and any gate code.
  5. The structure (the form lists manufactured homes), bedrooms, living area and water supply.
  6. Affidavits and an aerobic maintenance contract where they apply.

Allow 30 days for processing and inspection. An accepted application is valid for 12 months. In a floodplain hazard area, a floodplain determination may be needed first.

What does the state require in Kerr County?

The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.

What should the site plan show?

Even on a large tract, a new home now needs a septic permit, and the design depends on where the home, the system and its field, any well and the property lines sit. Mark any floodplain too. Stampd draws site plans for manufactured home placements.

More help with Texas placements

The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.

FAQ

Common questions

Does a septic system on 10 acres or more need a permit in Kerr County, Texas?

For new systems, yes. Kerr County's OSSF order, approved July 13 and effective August 7, 2026, requires a permit for all new septic systems regardless of tract size. The change is not retroactive: an existing system on a 10-acre-plus tract that serves one single-family home and meets the original state exception is grandfathered. Adding another dwelling or upgrading the system needs a permit.

Who issues septic permits in Kerr County?

Kerr County Environmental Health, 550 Earl Garrett Street, Suite 100, Kerrville, TX 78028 (830-896-9020), Monday to Friday 8 am to noon and 1 to 5 pm. It is the TCEQ authorized agent for septic systems in the county.

How much is a Kerr County septic permit?

For a new or upgraded system under 500 gallons per day: $240 plus the $10 state fee ($250), or $290 plus $10 ($300) if it needs a maintenance contract, such as an aerobic system. Over 500 gallons per day: $500, or $600 with a maintenance contract. Altering a permitted system is $100. Extra inspections, document revisions and affidavit recording are $25 each.

What does the Kerr County OSSF development permit application need?

Proof of ownership (warranty deed, contract for deed or the appraisal district property ID), the legal description (recorded plat, or metes and bounds if not platted), the 911 physical address, detailed directions to the site and any gate code, the structure type (the form lists manufactured homes), bedrooms and living area, and the water supply. Allow 30 days for processing and inspection; an accepted application is valid for 12 months.

What if the Kerr County site is in a floodplain?

The application says to contact the Kerr County Engineering Department (830-896-9046) if the site is in a floodplain hazard area. Environmental Health may require a floodplain determination before it processes the septic application.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Sources

Every fact on this page comes from one of these, checked on November 23, 2026. Rules and fees change; confirm with the office before you submit. This page is general information, not legal advice.

  1. Kerr County Environmental Health, On-Site Sewage Facility
  2. Kerr County, OSSF Fee Schedule
  3. Kerr County, Application for OSSF Development Permit (October 2025)
  4. TDHCA, Manufactured Housing installation records Installations reported in Kerr County, January to December 2025

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077