Bexar County, Texas

Manufactured home permits in Bexar County, Texas

Sources last checked

Outside city limits, Bexar County Public Works reviews floodplain development near the 100-year floodplain and Bexar County Environmental Services permits every septic (OSSF) system. Inside San Antonio, Development Services issues a Manufactured Home Installation Permit, with one application for a private lot and another for an established manufactured home park.

manufactured homes installed in Bexar County in 2025 (TDHCA installation records)
551
per activity for a Bexar County Floodplain Development Permit
$50
between renewals of a standard septic permit in Bexar County, with a pump receipt and a $30 fee
5 years
Get a quote for Bexar County For dealers and installers

Who issues the permit in Bexar County?

It depends on whether the property is inside San Antonio or another city, or in unincorporated Bexar County. Check the parcel first.

Where the property is Who handles placement What they cover
Unincorporated Bexar County Bexar County Public Works Floodplain development review near the 100-year floodplain, stormwater site development for larger disturbed areas
Unincorporated Bexar County Bexar County Environmental Services Septic (OSSF) permits
Unincorporated Bexar County, not a single-family dwelling Bexar County Fire Marshal Building permits, after a Permit Verification Form signed by Public Works
Inside San Antonio San Antonio Development Services Manufactured Home Installation Permit (private lot or established park) and trade permits
Inside another city That city Its own permits

The Fire Marshal’s building permit applies to structures that are not single-family dwellings, which the county defines as a single structure of three or fewer residential units. Properties in San Antonio’s extraterritorial jurisdiction (ETJ) also get some permits, such as tree permits, from the city.

What does unincorporated Bexar County require?

Floodplain. Bexar County Public Works reviews all construction on property near the 100-year floodplain. Apply through the county’s online permitting portal; the fee is $50 per activity. A flood study by a professional engineer may be required to set the base flood elevation or change the floodplain limits. If you cannot apply online, the Development Services kiosk is at Public Works, 1948 Probandt Street, San Antonio, TX 78214.

Septic (OSSF). Bexar County requires every on-site sewage facility to be permitted:

Permit When
New permit Installing a new system. Approves a License to Operate
Repair permit Repairing or changing an existing system
Renewal Standard systems every five years, with a pump receipt and a $30 fee. Aerobic systems: initial permit for two years, then a service contract with quarterly maintenance reports
Existing system registration An existing system with no permit. Needs a site survey and septic design by a sanitarian or engineer, and a pump manifest no older than a year

Septic installations are inspected at several points during installation.

Stormwater. A Stormwater Quality Site Development Permit applies in unincorporated Bexar County when one acre or more is disturbed, or less as part of a larger common plan of development.

What does San Antonio require on a private lot?

San Antonio’s Manufactured Home Installation Permit on Private Property goes through full plan review, and no review starts until the package is complete. The checklist asks for:

  • a signed building permit application and a notarized tree application or affidavit
  • two identical sets of drawings to scale, with foundation drawings stamped, sealed and signed by a Texas architect or engineer
  • a copy of the recorded plat, or a Letter of Determination if the lot is not platted
  • a site plan that matches the recorded plat, to scale, showing the legal description, address, buildings, property lines, easements, sidewalks, driveway approaches, fences, gates, parking, concrete work and building setbacks
  • a foundation plan, floor plans, exterior elevations, window and door details, and framing details for site-built stairs and landings

Other conditions on the application:

  • The property must front a paved city street, or the owner pays to pave half the street (Unified Development Code section 35-506(d)(9)C.3).
  • Projects in or near a floodplain need a signed release from storm water review.
  • Driveway approaches, sidewalks and fences need their own permits.
  • Plan review fees are due at submittal; building and trade permit fees when the permit is issued.
  • The home gets foundation, framing and final inspections, and the city must have a letter of inspection report from a licensed foundation engineer at the end.
  • Licensed trade contractors pull the electrical, plumbing, mechanical, sewer or septic, and gas permits, and every trade is inspected before utilities are released.
  • A permit becomes invalid if work does not start within 180 days of issue.

What does San Antonio require in a manufactured home park?

The park application is shorter. It is filed under the park’s name and lot number through the city’s BuildSA portal. A tenant applicant also gives the park manager’s or owner’s contact details and a letter from the park agreeing to the installation on that lot.

The home needs a foundation inspection and a final inspection before utilities are released. The foundation inspection must be done by a licensed engineer, and a stamped foundation letter is needed to pass it. Licensed trade contractors pull the electrical, plumbing, sewer and, where needed, mechanical and gas permits.

What does the state require in Bexar County?

The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.

What should the site plan show?

In San Antonio, the site plan must match the recorded plat and show every item on the city’s list above, to scale. In unincorporated Bexar County, the floodplain and septic reviews depend on where the home, the septic system and the floodplain boundary sit on the lot, so mark all three. Stampd draws site plans for manufactured home placements to the receiving office’s checklist.

More help with Texas placements

The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.

FAQ

Common questions

Who issues manufactured home permits in unincorporated Bexar County?

Several offices, each for its own part. Bexar County Public Works, 1948 Probandt Street, San Antonio (210-335-6700), reviews construction near the 100-year floodplain and issues Floodplain Development Permits. Bexar County Environmental Services permits septic (OSSF) systems. The Bexar County Fire Marshal issues building permits for structures that are not single-family dwellings.

Does San Antonio require a permit to install a manufactured home?

Yes. San Antonio Development Services issues a Manufactured Home Installation Permit. A home on a private lot goes through full plan review with drawings to scale and stamped foundation drawings. A home in an established manufactured home park uses a shorter park application; a tenant applicant needs a letter from the park agreeing to the installation on that lot.

What must a San Antonio private-lot site plan show?

The city's private-lot checklist asks for a site plan that matches the recorded plat and is drawn to scale, showing the legal description, address, buildings on site, property lines, easements, sidewalks, driveway approaches, fences, gates, parking, concrete work and building setbacks. A copy of the plat, or a Letter of Determination if the lot is not platted, goes with it.

Is an engineer needed for a manufactured home foundation in San Antonio?

Yes. On a private lot, foundation drawings must be stamped, sealed and signed, and the city must have a letter of inspection report from a licensed foundation engineer at the end of the project. In an established park, the foundation inspection must be done by a licensed engineer and a stamped foundation letter is needed to pass it.

Does every septic system in Bexar County need a permit?

Yes. Bexar County requires all on-site sewage facilities in the county to be permitted. A new system needs a new permit, which approves a License to Operate. Standard systems are renewed every five years with a pump receipt and a $30 fee; aerobic systems need a service contract after the initial two-year permit.

When is a Bexar County Floodplain Development Permit needed?

When construction is on property near the 100-year floodplain. Public Works reviews it through the county's online permitting portal, the fee is $50 per activity, and a flood study by a professional engineer may be required to set the base flood elevation or change the floodplain limits.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077