Who issues the permit in Bexar County?
It depends on whether the property is inside San Antonio or another city, or in unincorporated Bexar County. Check the parcel first.
| Where the property is | Who handles placement | What they cover |
|---|---|---|
| Unincorporated Bexar County | Bexar County Public Works | Floodplain development review near the 100-year floodplain, stormwater site development for larger disturbed areas |
| Unincorporated Bexar County | Bexar County Environmental Services | Septic (OSSF) permits |
| Unincorporated Bexar County, not a single-family dwelling | Bexar County Fire Marshal | Building permits, after a Permit Verification Form signed by Public Works |
| Inside San Antonio | San Antonio Development Services | Manufactured Home Installation Permit (private lot or established park) and trade permits |
| Inside another city | That city | Its own permits |
The Fire Marshal’s building permit applies to structures that are not single-family dwellings, which the county defines as a single structure of three or fewer residential units. Properties in San Antonio’s extraterritorial jurisdiction (ETJ) also get some permits, such as tree permits, from the city.
What does unincorporated Bexar County require?
Floodplain. Bexar County Public Works reviews all construction on property near the 100-year floodplain. Apply through the county’s online permitting portal; the fee is $50 per activity. A flood study by a professional engineer may be required to set the base flood elevation or change the floodplain limits. If you cannot apply online, the Development Services kiosk is at Public Works, 1948 Probandt Street, San Antonio, TX 78214.
Septic (OSSF). Bexar County requires every on-site sewage facility to be permitted:
| Permit | When |
|---|---|
| New permit | Installing a new system. Approves a License to Operate |
| Repair permit | Repairing or changing an existing system |
| Renewal | Standard systems every five years, with a pump receipt and a $30 fee. Aerobic systems: initial permit for two years, then a service contract with quarterly maintenance reports |
| Existing system registration | An existing system with no permit. Needs a site survey and septic design by a sanitarian or engineer, and a pump manifest no older than a year |
Septic installations are inspected at several points during installation.
Stormwater. A Stormwater Quality Site Development Permit applies in unincorporated Bexar County when one acre or more is disturbed, or less as part of a larger common plan of development.
What does San Antonio require on a private lot?
San Antonio’s Manufactured Home Installation Permit on Private Property goes through full plan review, and no review starts until the package is complete. The checklist asks for:
- a signed building permit application and a notarized tree application or affidavit
- two identical sets of drawings to scale, with foundation drawings stamped, sealed and signed by a Texas architect or engineer
- a copy of the recorded plat, or a Letter of Determination if the lot is not platted
- a site plan that matches the recorded plat, to scale, showing the legal description, address, buildings, property lines, easements, sidewalks, driveway approaches, fences, gates, parking, concrete work and building setbacks
- a foundation plan, floor plans, exterior elevations, window and door details, and framing details for site-built stairs and landings
Other conditions on the application:
- The property must front a paved city street, or the owner pays to pave half the street (Unified Development Code section 35-506(d)(9)C.3).
- Projects in or near a floodplain need a signed release from storm water review.
- Driveway approaches, sidewalks and fences need their own permits.
- Plan review fees are due at submittal; building and trade permit fees when the permit is issued.
- The home gets foundation, framing and final inspections, and the city must have a letter of inspection report from a licensed foundation engineer at the end.
- Licensed trade contractors pull the electrical, plumbing, mechanical, sewer or septic, and gas permits, and every trade is inspected before utilities are released.
- A permit becomes invalid if work does not start within 180 days of issue.
What does San Antonio require in a manufactured home park?
The park application is shorter. It is filed under the park’s name and lot number through the city’s BuildSA portal. A tenant applicant also gives the park manager’s or owner’s contact details and a letter from the park agreeing to the installation on that lot.
The home needs a foundation inspection and a final inspection before utilities are released. The foundation inspection must be done by a licensed engineer, and a stamped foundation letter is needed to pass it. Licensed trade contractors pull the electrical, plumbing, sewer and, where needed, mechanical and gas permits.
What does the state require in Bexar County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
In San Antonio, the site plan must match the recorded plat and show every item on the city’s list above, to scale. In unincorporated Bexar County, the floodplain and septic reviews depend on where the home, the septic system and the floodplain boundary sit on the lot, so mark all three. Stampd draws site plans for manufactured home placements to the receiving office’s checklist.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.