Who issues the permit in Cameron County?
Cameron County’s Flood Damage Prevention and Building Regulations require a building permit for any development in the unincorporated county. The County Engineer is the Floodplain Administrator, and applications are picked up at and returned to the county’s Planning and Inspections Division.
The rules state plainly that no one may erect, alter or move a building or manufactured home onto land without the required permits. Before issuing a permit, the Building Official visits the property to confirm nothing has been built or moved in yet.
Cities such as Brownsville, Harlingen and San Benito run their own permits.
What does the application need?
- the county’s application form
- plans in duplicate, drawn to scale, showing the location, dimensions and elevation of the proposed and existing structures, including the placement of manufactured homes, and their location relative to special flood hazard areas
- the elevation of the lowest floor relative to mean sea level
- a description of any change to a watercourse or natural drainage
- utility verification: sewer or septic availability, adequate drinking water, and electric service
- every licensed trade contractor on the project, each registered with the county before the permit is issued
If the property does not meet the county subdivision rules, the county advises hiring an engineer or surveyor to plat and record the tract.
How high, and how far back?
| Rule | Requirement |
|---|---|
| Lowest floor in a flood hazard area | 12 in above base flood elevation, or 24 in above the highest adjacent natural grade, whichever is higher |
| No depth number on the FIRM | 24 in above the highest adjacent natural grade |
| Area of minimal flood hazard | 18 in above the street center line or 18 in above natural grade, whichever is greater |
| Setback, most public roads | 25 ft from the right-of-way |
| Setback, major highways and roads | 50 ft from the right-of-way |
| Setback, side and rear | 5 ft from adjacent property lines |
| Recorded plat | Its setbacks apply if stricter |
Manufactured homes must be tied down to the TDHCA Chapter 80 rules, and square footage may not be added to a manufactured home unless a structural engineer designs it.
What are the fees?
| Valuation of improvements | Base building permit fee |
|---|---|
| $10,000 or less | $65 |
| Up to $100,000 | $65 plus $5 per additional $1,000 |
| Up to $500,000 | $350 plus $3 per additional $1,000 |
A $25 application processing fee applies, plus trade, inspection and certificate of occupancy fees ($75 residential) where they apply. Work without a permit can be fined up to $100 a day, to a total of $2,500, and the permit fee can be doubled.
What does the state require in Cameron County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
Cameron County asks for plans drawn to scale showing the home’s location, dimensions and elevation relative to the flood hazard area, and enforces road and side setbacks. Show the home, existing structures, the septic system, the driveway, the property lines, the road right-of-way and the flood zone, with distances and the setback lines. Stampd draws site plans for manufactured home placements.