Who issues the permit in Brazoria County?
For property outside city limits, the Brazoria County Floodplain/Building Permits Department issues building permits.
Floodplain/Building Permits, 451 North Velasco, Suite 210, Angleton, TX 77515. 979-864-1295.
A property inside Pearland, Alvin, Angleton, Lake Jackson or another city follows that city’s rules.
When is a building permit required?
| Situation | Permit required? |
|---|---|
| Structure over 200 sq ft, not in a flood zone | Yes |
| Completely enclosed structure of any size in a flood zone | Yes |
| Additions, repairs or renovations costing 50% or more of the structure’s market value (excluding land) | Yes |
A manufactured home is well over 200 square feet, so a placement needs a building permit whether or not the lot is in a flood zone. Brazoria County has issued building permits in its unincorporated area since March 1975.
How high must the home be set?
The department works through the same steps for every new structure:
- It checks whether the site address is in a FEMA flood hazard area.
- In a flood zone, it sets the required elevation at 2 feet above the base flood elevation.
- Outside a flood hazard area, the requirement is 2 feet above the highest adjacent grade.
The county keeps current and historical FEMA flood maps to make these determinations. If a home in a Special Flood Hazard Area is later repaired or expanded at a cost of 50% or more of its market value, the whole structure must be brought up to current floodplain rules.
What about septic?
For property outside city limits, Brazoria County Environmental Health reviews septic (OSSF) permits. A licensed site evaluator does the site evaluation, and the system is installed by a TCEQ-licensed installer. Ask Environmental Health for the current checklist and fee before applying.
What does the state require in Brazoria County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
In Brazoria County, the elevation rule drives the job, so the site plan should show the home’s position against the flood zone boundary, the existing grade around it, the septic system and the property lines. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.