Who issues the permit in Gregg County?
For septic systems, the Gregg County Health Department.
Gregg County Health Department, 405 East Marshall Avenue, Longview, TX 75601. 903-237-2621.
Other approvals, such as floodplain, 911 address and driveway permits, are separate. Property inside Longview, Kilgore or another city may follow that city’s rules.
Does the lot qualify?
| Water supply | Minimum lot |
|---|---|
| Community water | Half an acre |
| Water well | 1 acre |
Smaller lots platted before January 1, 1988: contact the health department.
How do you get the septic permit?
| Conventional design | Professional design | |
|---|---|---|
| When | A standard system on a qualifying lot | Irregular or undersized lots, substantial variances, unconventional or innovative systems, aerobic systems |
| Who designs it | A registered sanitarian or professional engineer does the site evaluation and design plan | A registered sanitarian or professional engineer does the site evaluation and full design |
| What you submit | Application, technical information sheet in the owner’s name, maintenance and water conservation acknowledgement, fee, site evaluation results and system diagram | The same, with complete design plans (checklist, site evaluation and system design). Aerobic systems add an Affidavit to the Public and a maintenance agreement |
| Fee | $350 | $350 single-family, $450 commercial |
Then:
- The health department reviews the application and plans.
- On approval, it issues the Authorization to begin construction.
- The system is inspected before it is covered. Call at least one working day ahead.
- After a successful inspection, the owner receives a Notice of Approval.
Anyone other than the owner who builds the system must hold a valid Texas installer license.
What does the state require in Gregg County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
The septic design depends on where the home, the system and its field, any well, the driveway and the property lines sit. Show them with distances, along with any part of the lot in a mapped flood zone. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.