Who issues the permit in Fayette County?
For the unincorporated county, offices in the Fayette County Courthouse, 151 N Washington, La Grange, TX 78945:
| What | Office | Phone |
|---|---|---|
| Development permit (Class A or B) | Office of Floodplain Administration, Room 307 | 979-968-1807 |
| Septic (OSSF) permit | Development Regulations Enforcement Office, Room 307 | 979-968-1809 |
| 911 address | 9-1-1 Addressing, Room 302 | 979-968-1810 |
| Driveway on a county road | The precinct commissioner | Via the county |
Step 1: the development permit
Before any development in the unincorporated county (homes, septic systems, driveways, wells, utility poles, culverts and more), the property owner, not an agent, must request the application. It lists “place manufactured housing.”
- Request a floodplain map of the property and the application from the County Judge’s office (979-968-6469).
- Check whether the home site is in or out of the 1% annual chance floodplain.
- Complete the application. Any blank section sends it back without review.
| Permit | Where | Fee |
|---|---|---|
| Class A | Entirely outside the floodplain (Zone X). Exempt from the county floodplain rules | $20 |
| Class B | Any part inside the floodplain (Zone A or AE) | $100 |
Pay by cash or check to Fayette County. The permit must be posted where it can be seen from the nearest road.
What does a Class B permit require?
- The lowest floor at least 3 feet above the base flood elevation (BFE).
- If no BFE exists, a licensed professional engineer sets one and a preliminary elevation certificate goes with the application.
- Utility lines, outlets and equipment 3 feet above the BFE, and backflow devices on water and sewer.
- A foundation built to withstand flood forces.
- An engineer’s certification of the floor elevation with the application.
Step 2: the septic permit
The application asks for the 911 address, legal description, property ID, whether the property is in a flood area, the structure type, bedrooms, square footage, the system type, the designer and the installer. The permit is valid for one year after purchase.
Step 3: the driveway
Under Fayette County’s driveway standards (effective June 3, 2019):
- No driveway or culvert work may begin until the precinct commissioner signs a permit.
- Culverts are corrugated galvanized metal pipe, 20 to 75 feet long, at a minimum grade of 1/8 inch per foot.
- Pipes over 30 inches need safety end treatments.
- The owner pays for and maintains the driveway and culvert.
What does the state require in Fayette County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
Whether the permit is Class A or Class B depends on exactly where the home sits relative to the floodplain. Show the home, the septic system and its field, any well, the driveway and culvert, the property lines and the floodplain boundary. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.