Red River County, Texas

Manufactured home permits in Red River County, Texas

Sources last checked

In Red River County, septic permit applications go to the County Auditor's Office in Clarksville. File the affidavit with the County Clerk first ($25), then submit the completed application with the GEO number from the Red River Appraisal District. The residential septic permit is $330, under fees effective July 14, 2025.

manufactured homes installed in Red River County in 2025 (TDHCA installation records)
22
Red River County residential septic permit, fees effective July 14, 2025
$330
to file the septic affidavit with the County Clerk before applying
$25
Get a quote for Red River County For dealers and installers

Who issues the permit in Red River County?

Septic permit applications are accepted at the Red River County Auditor’s Office in Clarksville, Monday to Thursday. The county posts its septic regulations (2021), the 2025 septic permit application and affidavit, and a culvert installation document on its permits page.

Property inside Clarksville or another city may follow the city’s rules instead. Check with the city first.

How does the septic permit work?

  1. File the affidavit with the Red River County Clerk’s Office before submitting anything else. The filing fee is $25, payable to the County Clerk.
  2. Get the GEO number for the property from the Red River Appraisal District.
  3. Complete every blank on the application. Write N/A where a blank does not apply.
  4. Submit the filed affidavit and the application to the Auditor’s Office with the fee, payable to Red River County.
Fee (as of July 14, 2025) Amount
Residential septic permit $330
Commercial septic permit $530
Affidavit filing, County Clerk $25

The county notes that fees may change.

What does the state require in Red River County?

The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.

What should the site plan show?

The septic design for a Red River County application depends on where the home, the tank, the drain field and any water well sit on the lot. A site plan with property lines, distances and the driveway keeps the designer, the installer and the county working from the same layout. Stampd draws site plans for manufactured home placements.

More help with Texas placements

The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.

FAQ

Common questions

Where do I apply for a septic permit in Red River County, Texas?

At the Red River County Auditor's Office in Clarksville, Monday to Thursday. The completed application and the filed affidavit are submitted there, with the fee payable to Red River County.

How much is a Red River County septic permit?

The county's 2025 application lists $330 for a residential system and $530 for a commercial system, as of July 14, 2025. Before applying, the affidavit must be filed with the County Clerk's Office for $25. The county notes that fees may change.

What does the Red River County septic application need?

The GEO number for the property, from the Red River Appraisal District. Every blank on the application must be filled in, with N/A where a blank does not apply. The affidavit must already be filed with the County Clerk.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Sources

Every fact on this page comes from one of these, checked on November 24, 2026. Rules and fees change; confirm with the office before you submit. This page is general information, not legal advice.

  1. Red River County, Permits
  2. Red River County, 2025 Septic Permit Application
  3. Red River County, OSS Regulations (2021)
  4. TDHCA, Manufactured Housing installation records Installations reported in Red River County, January to December 2025

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077