Under the process dated September 12, 2025, Montague County requires a minimum lot of 2 acres per single-family residence on a septic system, whether it uses public water or a private well. A conventional septic permit is $410 and an aerobic permit is $510. The application needs a site and soil evaluation, a county-approved design and a plat or survey showing the legal description and lot size. The county approves or denies within 30 days.

manufactured homes installed in Montague County in 2025 (TDHCA installation records)
42
minimum lot per single-family residence on septic in Montague County (process of September 12, 2025)
2 acres
Montague County conventional septic permit; $510 aerobic, $560 commercial or multi-unit
$410
Get a quote for Montague County For dealers and installers

Who issues the permit in Montague County?

For septic systems, the Montague County sewage inspector: 940-531-2179, Monday to Friday, 8 am to 5 pm.

What lot size is needed?

Under the county’s septic permit process dated September 12, 2025, the minimum lot is 2 acres per single-family residence, with public water or a private well.

The earlier version allowed 1 acre with public water, so check a lot bought on the old rule before ordering a home for it.

What does a septic permit need?

Conventional Aerobic
Application (county/TCEQ approved) Yes Yes
Site and soil evaluation by an engineer, sanitarian or licensed site evaluator Yes Yes
Design by an engineer, sanitarian or licensed installer, approved by the county Yes Yes
Plat or land survey with legal description and lot size Yes Yes
Signed service contract with a licensed maintenance provider Yes
Certified copy of the notarized affidavit, filed with the County Clerk Yes
Fee $410 ($560 commercial or multi-unit) $510

Pay by cash, check or money order.

How long does it take?

  • The county approves or denies within 30 days of receiving everything.
  • Problem resolution can take up to another 30 days, and a denial is given in writing.
  • No part of a system may be installed until approval is confirmed.
  • An inspection is required after installation and before cover-up.

What does the state require in Montague County?

The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.

What should the site plan show?

Montague County asks for the plat or survey with the lot size, and the 2-acre minimum is per residence. Show the property lines and acreage, the home, the septic system and its field, any well and the driveway. Stampd draws site plans for manufactured home placements.

More help with Texas placements

The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.

FAQ

Common questions

What is the minimum lot size for a home on septic in Montague County, Texas?

2 acres per single-family residence, with public water or a private well, under the county's septic permit process dated September 12, 2025. The earlier version allowed 1 acre with public water, so lots bought on the old rule should be checked.

How much is a septic permit in Montague County?

$410 for a conventional system ($560 for commercial or multi-unit) and $510 for an aerobic system, payable in cash, check or money order.

What does a Montague County septic application need?

The county/TCEQ-approved application, a site and soil evaluation by an engineer, sanitarian or licensed site evaluator, a system design by an engineer, sanitarian or licensed installer approved by the county, and a copy of the plat or land survey with the legal description and lot size. Aerobic systems also need a signed service contract with a licensed maintenance provider and a certified copy of the notarized affidavit filed with the County Clerk.

How long does Montague County take to approve a septic permit?

The county approves or denies an application within 30 days of receiving everything, and problem resolution can take up to another 30 days. No part of a system may be installed until approval is confirmed, and an inspection is required after installation and before cover-up.

Who is the septic contact in Montague County?

The county sewage inspector, at 940-531-2179, Monday to Friday, 8 am to 5 pm.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Sources

Every fact on this page comes from one of these, checked on November 23, 2026. Rules and fees change; confirm with the office before you submit. This page is general information, not legal advice.

  1. Montague County, Sewage Inspector
  2. Montague County, OSSF Permit Process (September 12, 2025)
  3. TDHCA, Manufactured Housing installation records Installations reported in Montague County, January to December 2025

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077