Who issues the permit in Anderson County?
For property outside city limits, the main county permit for a manufactured home on its own septic system is the On-Site Sewage Facility (OSSF) permit. TCEQ has approved Anderson County as its authorized agent for septic systems.
Septic applications go to the Anderson County Emergency Management Office, Room 109, Anderson County Courthouse Annex, Palestine.
Property inside Palestine or another city follows that city’s rules.
Get the 911 address first. The septic application needs a 911 address and a property description. If the property has none, Anderson County says to call 903-218-6400.
What does the septic (OSSF) package need?
Anderson County asks for every document at submittal and warns that missing ones delay the permit:
| Document | Conventional system | Aerobic system |
|---|---|---|
| Application for permit, with 911 address and property description | Yes | Yes |
| Soil evaluation sheet (registered site evaluator or professional engineer) | Yes | Yes |
| Technical information sheet | Yes | Yes |
| Design drawing (registered sanitarian or professional engineer) | Yes | Yes |
| Plat drawing | Yes | Yes |
| Location map | Yes | Yes |
| Written driving directions | Yes | Yes |
| Affidavit to the Public, certified copy from the County Clerk | Yes | |
| Maintenance contract (two years for residential) | Yes |
The site evaluation and the design must be originals.
What are the fees and timing?
- $325 for a single-family residence, $350 for commercial and other types, paid to Anderson County by check or money order. Credit cards are not accepted, and the fee is non-refundable once the review is done.
- A failed first inspection means each re-inspection costs half the permit fee, paid before the inspection.
- The Authorization to Construct is valid for one year. If the system is not installed in that time, the owner reapplies and pays a new fee.
- The installer books the final inspection, and a Notice of Approval is issued when the system meets TCEQ and county rules.
- Anderson County allows the Ten Acre Rule.
- RV parks and manufactured home parks must follow the Anderson County Subdivision Rules before they are set up.
What does the state require in Anderson County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
Anderson County’s septic package includes a plat drawing and a location map. Show the home, the septic system and its field, any well, the driveway and the property lines with distances, so the site evaluator, the designer and the county work from the same layout. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.