Who issues the permits in Hood County?
Hood County does not issue building permits or inspect residential construction. For a manufactured home in the unincorporated county, the county’s Development FAQ says you need the same permits as for a house:
| Permit | Who issues it | Contact |
|---|---|---|
| Septic (OSSF) permit | Hood County Environmental Health, 5417 Acton Hwy, Granbury | 817-579-3288 |
| Road access permit | Hood County Road Operations | |
| Water well permit, if needed | Upper Trinity Groundwater Conservation District | |
| Floodplain development permit, if any part of the property is in a special flood hazard area | Hood County Floodplain Administrator, Hood County Development | 817-408-2515 |
Hood County Development is at 5417 Acton Hwy, Granbury; forms go by mail to 1402 W. Pearl Street, Suite 2, Granbury, TX 76048.
If the property is in the ETJ of a Hood County city, that city’s rules may also apply.
The county will not tell you whether a home is allowed. The Development Department cannot say whether a property can have a manufactured home or is buildable. Check the deed restrictions and covenants, or ask a private site evaluator.
What does the septic permit cost?
A permit is required for every installation, modification and replacement. Hood County Environmental Health fees:
| Item | Fee |
|---|---|
| New residential system | $475 |
| Residential modification | $310 |
| Commercial, 0 to 1,000 gallons a day | $510 |
| Re-inspection | $150 |
| Annual aerobic registration | $20 |
A system installed without a permit pays double, with no exceptions. After the initial two-year service policy, a homeowner may maintain their own aerobic system only if it is their homestead and they have completed approved training, reporting test results three times a year.
When is a floodplain permit needed?
If any part of the property is in a special flood hazard area, you may need a floodplain development permit before any construction or excavation. The county posts its Flood Damage Prevention Order, a floodplain development authorization form and the permit form.
| Item (Development fee schedule) | Fee |
|---|---|
| Floodplain development permit | $100 |
| Floodplain variance request | $60 |
Any development before approval doubles the listed fees. Flood Insurance Rate Maps can be viewed at Environmental Health.
What does the state require in Hood County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
With no county building permit, the septic design, the road access permit and any floodplain permit are where the layout gets checked. A site plan should show the property lines, the home, the septic tank and drain field, the driveway where it meets the county road, any water well, and the flood hazard boundary if the property touches one. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.