Who issues the permit in Hardin County?
The Hardin County Floodplain office issues the county’s Manufactured Home Placement Permit.
Hardin County Floodplain, 300 Monroe, Kountze, TX 77625. 409-246-5251.
A property inside Lumberton, Silsbee, Kountze or another city may follow that city’s rules instead.
What is the Manufactured Home Placement Permit?
A one-page application with a $100 fee payable to Hardin County. It asks for:
| Item | |
|---|---|
| Applicant and property owner | Names |
| Placement address | The physical address where the home will go, with lot or space number |
| Applicant contact | Mailing address and two phone numbers |
| Installer | Name and phone number |
| Service requested | A short description |
The office records the flood zone and FIRM panel number for each placement. If the home is going into a flood zone, the county requests additional paperwork.
Rules that come with the permit
- No work of any kind may start until the permit is issued.
- The permit can be revoked for false statements, and work stops until it is re-issued.
- The permit expires if no work starts within six months.
- Other permits may still be required.
- The applicant consents to reasonable inspections to verify compliance.
Driveway culverts
A culvert onto a county road needs a Culvert Placement Permit, also from the Floodplain office:
| Culvert | Fee |
|---|---|
| First culvert | $50 permit. The customer provides the culvert to county specifications |
| Second culvert on the same property | $50 permit plus $400 installation |
| Landscape culvert | $50 per 10-foot section, with cleanout drains every 10 feet |
What does the state require in Hardin County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
The placement permit form is short, but the flood zone paperwork and the septic design depend on exactly where the home sits. Show the home against the flood zone boundary, the septic system, the driveway culvert and the property lines. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.