Bee County, Texas

Manufactured home permits in Bee County, Texas

Sources last checked

In Bee County, the Community Affairs Department in Beeville issues a development permit, and its application lists manufactured homes and the property's flood zone. Bring the AEP ESID number (if AEP is the provider), a 911 address verification form from the Sheriff's Office, the legal description from the Tax Office and a $35 processing fee. Community Affairs also handles septic permits as the TCEQ authorized agent.

manufactured homes installed in Bee County in 2025 (TDHCA installation records)
47
Bee County development permit processing fee (cash, check or money order; no credit cards)
$35
things to bring to Community Affairs: ESID number, 911 verification, legal description and the fee
4
Get a quote for Bee County For dealers and installers

Who issues the permit in Bee County?

The Bee County Community Affairs Department issues development permits and septic permits.

Community Affairs, 216 S. FM 351, Beeville, TX 78102. 361-621-1553. Cash, check or money order only; no credit cards.

Inside the City of Beeville, the city’s Development Services handles permits instead.

What does the development permit need?

The application lists manufactured homes and records the flood zone. Follow the county’s checklist in order:

  1. Electric provider. For AEP, get the 17-digit ESID number from AEP (1-877-373-4858) and choose a retail electric provider. For San Patricio Electric Cooperative, call SPEC (361-364-2220) to arrange the connection.
  2. 911 address. Get a 911 address verification form on Sheriff’s Office letterhead from the Bee County Sheriff’s Office, 1509 Galloway Drive (361-362-3221).
  3. Legal description. Take the 911 form to the Tax Assessor’s office, 411 E. Houston Street (361-621-1554), for a copy of the property description.
  4. Bring the ESID number, the 911 verification, the legal description and the $35 processing fee to Community Affairs.

The director may inspect the property. Once the permit is complete, the office emails the details to AEP or SPEC, and the owner follows up with the provider.

Utility districts. Blueberry Hill, Pawnee, Pettus, Skidmore and Tynan residents must also show proof of water connection (Skidmore and Tynan: water and sewer).

What about flood zones?

The application records the flood map number, flood zone and map date. The Bee County Floodplain Administrator decides whether the property is in an identified flood hazard area and whether other permits apply. In a floodplain, provide a copy of the plans and specifications.

What does the septic permit need?

Community Affairs acts as TCEQ’s authorized agent. The application asks for:

  • the 911 site address and legal description, with proof such as a deed, plat or survey
  • directions to the site and the water source (private well or public supply)
  • bedrooms and living area
  • a soil and site evaluation, with at least two soil excavations at upper and lower elevations of the disposal area
  • a professional design and planning materials, where required

Do not begin construction before the Authorization to Construct is issued.

What does the state require in Bee County?

The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.

What should the site plan show?

The septic application asks for a site drawing with the lot size, and in a floodplain the county asks for plans. Show the home, the septic system and its field, any well, the driveway, the property lines and the flood zone. Stampd draws site plans for manufactured home placements.

More help with Texas placements

The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.

FAQ

Common questions

Does a manufactured home need a permit in Bee County, Texas?

Yes. The Bee County Community Affairs Department, 216 S. FM 351, Beeville, TX 78102 (361-621-1553), issues a development permit. Its application lists manufactured homes as a type of new construction and records the flood map, flood zone and septic inspection. Once the permit is done, the office emails the details to AEP or San Patricio Electric Cooperative so power can be connected.

What does the Bee County development permit checklist need?

1) If AEP is the electric provider, the 17-digit ESID number from AEP and a retail electric provider; for San Patricio Electric Cooperative, arrange the connection with SPEC. 2) A 911 address verification form on Sheriff's Office letterhead, from the Bee County Sheriff's Office (361-362-3221). 3) The legal description, from the Tax Assessor's office (361-621-1554). 4) The $35 processing fee, in cash, check or money order.

Are there extra requirements in Bee County utility districts?

Yes. Residents of Blueberry Hill, Pawnee, Pettus, Skidmore and Tynan must show proof of water (and in Skidmore and Tynan, sewer) connection to the local provider before the permit is issued.

Who issues septic permits in Bee County?

The Community Affairs Department, as TCEQ's authorized agent. The application asks for the 911 site address, the legal description with proof such as a deed, plat or survey, directions, the water source, bedrooms and living area, and a soil and site evaluation with at least two soil excavations. Construction cannot start before the Authorization to Construct is issued.

What about flood zones in Bee County?

The development permit application records the flood map number, flood zone and map date, and the Bee County Floodplain Administrator decides whether the property is in an identified flood hazard area. In a floodplain, the applicant provides a copy of plans and specifications for the construction.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Sources

Every fact on this page comes from one of these, checked on November 23, 2026. Rules and fees change; confirm with the office before you submit. This page is general information, not legal advice.

  1. Bee County Community Affairs, Checklist to Obtain a Development Permit
  2. Bee County, Development Permit Application
  3. Bee County Community Affairs, Application for On-Site Sewage Facility (April 2025)
  4. TDHCA, Manufactured Housing installation records Installations reported in Bee County, January to December 2025

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077