Brown County, Texas

Manufactured home permits in Brown County, Texas

Sources last checked

Brown County requires two permits: a development permit before placing any structure, and a septic (OSSF) permit before installing a system on a tract of 10 acres or less. Both need a legal plat and a 911 address. The septic permit is $210 with two inspections, and the application lists manufactured homes. Above 10 acres, the system is registered instead, with a site evaluation, layout and legal description.

manufactured homes installed in Brown County in 2025 (TDHCA installation records)
57
Brown County septic (OSSF) permit, including two inspections (application revised January 2025)
$210
or less needs a Brown County septic permit; larger tracts register the system for $25
10 acres
Get a quote for Brown County For dealers and installers

Who issues the permit in Brown County?

The Brown County Permitting Department issues both permits.

Brown County Permitting Department, Brown County Courthouse, 200 South Broadway, Room 322, Brownwood, TX 76801. 325-643-1985.

Which permits are needed?

Permit When What it needs
Development permit Before any construction, placement of structures, altering land or placing fill anywhere in Brown County Legal plat, 911 address, planning materials if in a flood area, fee
Septic (OSSF) permit Before installing or repairing a septic system on a tract of 10 acres or less Legal plat, soil evaluation, system layout design, 911 address, fee
Septic registration Septic systems on tracts over 10 acres Site evaluation, layout and legal description

What are the fees?

Item Fee
Septic (OSSF) permit, including two inspections $210
Extra inspection $50 each
Septic registration, over 10 acres $25
Development permit $20
Floodplain inspection, including two inspections $100

What does the septic package need?

The county’s checklist asks for:

  • a site evaluation with at least two soil borings or pits at opposite ends of the disposal area, dug 2 feet below the proposed trench, covering soil texture and structure, restrictive horizons, groundwater, topography, flood hazard, easements and bodies of water, and all wells on the site and neighboring properties
  • two copies of the construction drawing: a detailed, legible site plan with a boundary description, the buildings, the size and location of the treatment units and disposal area, all wells, easements and bodies of water, and every Table X separation distance
  • for aerobic systems, scale drawings, the legal description, an affidavit to the public and a maintenance agreement
  • a plot plan and installer checklist from a licensed installer, including slope, wells, water supply and lot size

Do not start construction before approval. The authorization to construct is valid for one calendar year; if no construction inspection is requested in that time, reapply and pay again.

What about flood zones and Lake Brownwood?

Brown County takes part in the National Flood Insurance Program and has a Flood Damage Prevention Order. In a flood area, the development permit needs the project’s planning materials and a floodplain inspection.

What does the state require in Brown County?

The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.

What should the site plan show?

Brown County’s septic package asks for a detailed site plan with the boundary, buildings, the system and disposal area, wells on the site and next door, easements, water and every separation distance. Stampd draws site plans for manufactured home placements.

More help with Texas placements

The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.

FAQ

Common questions

What permits does a manufactured home need in Brown County, Texas?

Brown County lists two: a development permit, required before any construction, placement of structures or fill anywhere in the county, and a septic (OSSF) permit, required before installing or repairing a septic system on a tract of 10 acres or less. Both are issued by the Brown County Permitting Department, 200 South Broadway, Room 322, Brownwood, TX 76801 (325-643-1985).

What does a Brown County development permit need?

A legal plat of the property, a 911 address, the planning materials for the project if it is in a flood area, and the fee. The county pamphlet lists a $20 development permit fee, plus a $100 inspection fee in a floodplain covering two inspections.

What does a Brown County septic permit need?

A legal plat, a soil evaluation, a design of the system layout, a 911 address and the $210 fee, which covers two inspections; extra inspections are $50 each. The site evaluation needs at least two soil borings or pits at opposite ends of the disposal area. The construction drawing must be a detailed, legible site plan with a boundary description, showing buildings, the treatment units and disposal area, all wells on the site and neighboring properties, easements, bodies of water and Table X separation distances.

Is a septic permit needed on more than 10 acres in Brown County?

The county says a permit is required on tracts of 10 acres or less. Above 10 acres, the system must be registered with a site evaluation, layout and legal description, for a $25 registration fee.

How long is a Brown County septic authorization valid?

One calendar year. If the installer does not request a construction inspection within a year, the authorization to construct expires and the owner must reapply and pay again. Construction must not begin before the application is approved.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Sources

Every fact on this page comes from one of these, checked on November 23, 2026. Rules and fees change; confirm with the office before you submit. This page is general information, not legal advice.

  1. Brown County, Permitting
  2. Brown County, OSSF Permit Application Packet (revised January 22, 2025)
  3. Brown County, Permit Pamphlet
  4. TDHCA, Manufactured Housing installation records Installations reported in Brown County, January to December 2025

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077