Who issues the permit in Brown County?
The Brown County Permitting Department issues both permits.
Brown County Permitting Department, Brown County Courthouse, 200 South Broadway, Room 322, Brownwood, TX 76801. 325-643-1985.
Which permits are needed?
| Permit | When | What it needs |
|---|---|---|
| Development permit | Before any construction, placement of structures, altering land or placing fill anywhere in Brown County | Legal plat, 911 address, planning materials if in a flood area, fee |
| Septic (OSSF) permit | Before installing or repairing a septic system on a tract of 10 acres or less | Legal plat, soil evaluation, system layout design, 911 address, fee |
| Septic registration | Septic systems on tracts over 10 acres | Site evaluation, layout and legal description |
What are the fees?
| Item | Fee |
|---|---|
| Septic (OSSF) permit, including two inspections | $210 |
| Extra inspection | $50 each |
| Septic registration, over 10 acres | $25 |
| Development permit | $20 |
| Floodplain inspection, including two inspections | $100 |
What does the septic package need?
The county’s checklist asks for:
- a site evaluation with at least two soil borings or pits at opposite ends of the disposal area, dug 2 feet below the proposed trench, covering soil texture and structure, restrictive horizons, groundwater, topography, flood hazard, easements and bodies of water, and all wells on the site and neighboring properties
- two copies of the construction drawing: a detailed, legible site plan with a boundary description, the buildings, the size and location of the treatment units and disposal area, all wells, easements and bodies of water, and every Table X separation distance
- for aerobic systems, scale drawings, the legal description, an affidavit to the public and a maintenance agreement
- a plot plan and installer checklist from a licensed installer, including slope, wells, water supply and lot size
Do not start construction before approval. The authorization to construct is valid for one calendar year; if no construction inspection is requested in that time, reapply and pay again.
What about flood zones and Lake Brownwood?
Brown County takes part in the National Flood Insurance Program and has a Flood Damage Prevention Order. In a flood area, the development permit needs the project’s planning materials and a floodplain inspection.
What does the state require in Brown County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
Brown County’s septic package asks for a detailed site plan with the boundary, buildings, the system and disposal area, wells on the site and next door, easements, water and every separation distance. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.