Fort Bend County, Texas

Manufactured home permits in Fort Bend County, Texas

Sources last checked

In unincorporated Fort Bend County, a manufactured home needs a development permit from Fort Bend County Engineering in Richmond, applied for online. Upload the recorded deed, a survey or site plan, the county's simplified grading plan, a septic design if the home uses a septic system, and a CenterPoint address verification letter. The permit is $100, or $150 in the floodplain.

manufactured homes installed in Fort Bend County in 2025 (TDHCA installation records)
162
Fort Bend County development permit; $150 in the floodplain, $250 on an unplatted property
$100
that a Fort Bend County development permit is valid once issued
1 year
Get a quote for Fort Bend County For dealers and installers

Who issues the permit in Fort Bend County?

Fort Bend County Engineering issues development permits for all unincorporated areas of the county, and its home guideline covers new home construction and manufactured homes.

Fort Bend County Engineering, 301 Jackson Street, Suite 401, Richmond, TX 77469. 281-633-7500.

A residential development permit is required for any new structure of 400 square feet or more. The county also issues development permits for the City of Kendleton, Town of Thompsons, Village of Fairchilds and Village of Pleak under inter-local agreements. Other cities run their own permits.

What do you upload?

Apply online through MyGovernmentOnline and upload:

Document Notes
Recorded deed A copy
Survey or site plan See below
Simplified grading plan The county’s form, under Letters & Forms
Septic design For homes that need a septic system
Address verification letter From CenterPoint, with the full address, street number, city and ZIP code
ESID number From CenterPoint, 713-207-2222

What are the fees?

Permit Fee
Development permit $100
Development permit in the floodplain $150
Development permit, unplatted property $250
Residential driveway $150, includes one inspection
Change of address $30
Address verification and power release $25

Projects started before the permit is issued pay double fees. Once issued, the permit is valid for one year.

Septic, driveway and power

  • Septic. Required for every property not connected to an approved sewer system. Fort Bend County Environmental Health Department, 281-342-7469.
  • Open-ditch driveway. Fort Bend County Road and Bridge, 281-342-4513.
  • Curb-and-gutter driveway. Apply online with a site plan and a traffic control plan.
  • Power. Request temporary or permanent power through the MyGovernmentOnline portal once ready. Do not request both at once.

What does the state require in Fort Bend County?

The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.

What should the site plan show?

Fort Bend County asks for a survey or site plan alongside a grading plan and the septic design, and for other development it asks for a site plan or survey from a registered professional land surveyor. A plan showing the home, the septic system, the driveway, drainage and the floodplain boundary, with distances to the property lines, ties the three together. Stampd draws site plans for manufactured home placements.

More help with Texas placements

The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.

FAQ

Common questions

Does a manufactured home need a permit in Fort Bend County, Texas?

Yes. Fort Bend County Engineering issues development permits for all unincorporated areas, and its guideline for new home construction and manufactured homes covers manufactured homes. A residential development permit is required for any new structure of 400 square feet or more. Engineering is at 301 Jackson Street, Suite 401, Richmond, TX 77469 (281-633-7500).

What documents does Fort Bend County need for a manufactured home permit?

Apply online through MyGovernmentOnline and upload a copy of the recorded deed, a survey or site plan, the county's simplified grading plan, a septic design if the home needs a septic system, and an address verification letter from CenterPoint showing the full address with street number, city and ZIP code. You also need the ESID number, which CenterPoint provides at 713-207-2222.

How much is a Fort Bend County development permit?

$100, or $150 in the floodplain, and $250 for an unplatted property. A residential driveway permit is $150 and includes one inspection. Projects started before permits are issued are charged double fees.

Who handles septic systems in Fort Bend County?

The Fort Bend County Environmental Health Department (281-342-7469). Septic permits are required for every property not connected to an approved sewer system, and the septic design is uploaded with the development permit application.

Who issues driveway permits in Fort Bend County?

For an open-ditch driveway, Fort Bend County Road and Bridge (281-342-4513). For a curb-and-gutter driveway, apply online with a site plan and a traffic control plan.

Which cities use Fort Bend County for development permits?

The county has inter-local agreements to issue development permits for the City of Kendleton, the Town of Thompsons, the Village of Fairchilds and the Village of Pleak. Other cities, such as Rosenberg, Richmond, Sugar Land and Missouri City, run their own permits.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Sources

Every fact on this page comes from one of these, checked on November 23, 2026. Rules and fees change; confirm with the office before you submit. This page is general information, not legal advice.

  1. Fort Bend County Engineering, Development Permits
  2. Fort Bend County Engineering, new home construction and manufactured home requirements
  3. TDHCA, Manufactured Housing installation records Installations reported in Fort Bend County, January to December 2025

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077