Angelina County, Texas

Manufactured home permits in Angelina County, Texas

Sources last checked

In Angelina County, septic (OSSF) permits are issued by the Angelina & Neches River Authority (ANRA) in Lufkin, as TCEQ's authorized agent. Where there is no public sewer, a manufactured home needs an ANRA Permit to Construct before the system goes in, then a License to Operate after inspection. The single-family residential fee is $485, including the TCEQ fee.

manufactured homes installed in Angelina County in 2025 (TDHCA installation records)
203
ANRA single-family residential septic permit, including the $10 TCEQ fee (effective May 1, 2025)
$485
that an ANRA Permit to Construct stays valid
1 year
Get a quote for Angelina County For dealers and installers

Who handles a placement in Angelina County?

The approval most placements need is the septic (OSSF) permit, issued by the Angelina & Neches River Authority (ANRA) as TCEQ’s authorized agent.

ANRA OSSF Department, 2901 N John Redditt Drive, Lufkin, TX 75904. 936-632-7795.

ANRA covers all of Angelina County and San Augustine County, plus the regulated zone around Sam Rayburn Reservoir: from the U.S. Army Corps of Engineers 179-foot elevation line out 2,000 feet. If any part of a subdivision lies in that zone, the whole subdivision is under ANRA.

We did not find a separate county placement or development permit published online. Check with Angelina County before placing, and a property inside Lufkin or another city follows that city’s rules.

When is a septic permit needed?

If public sewer is available, the property must connect to it. If not, the owner needs an ANRA permit to construct, alter, repair, extend or operate a septic system. Systems installed before the local rules took effect (before September 1, 1989) can be exempt.

How do you get a Permit to Construct?

  1. A TCEQ-licensed site evaluator decides whether the lot suits a conventional system or needs an aerobic one.
  2. A registered sanitarian or professional engineer drafts the site design.
  3. For an aerobic system, two notarized affidavits to the public: one filed at the County Clerk, one with ANRA.
  4. Submit the packet: the application, the fee, and originals of the site evaluation, site design, affidavit and aerobic information sheet.

ANRA can usually issue the permit within days; state law allows up to 30. It is valid for one calendar year. If the installer does not request an inspection within that year, a new application and fee are needed.

What are the fees?

Permit ANRA fee TCEQ fee Total
Single-family residential $475 $10 $485
Non-single-family, light (3 or fewer structures, normal flow) $600 $10 $610
Non-single-family, heavy (4 or more structures, food prep or high flow) $1,500 $10 $1,510
Re-inspection $250
Re-design $175
License transfer $35

Effective May 1, 2025. No refunds after a five-day grace period.

After installation

The installer requests an inspection with ANRA at least five working days before the system is ready. After it passes, ANRA issues a License to Operate to the owner. Aerobic systems need a service contract (at least the first two years for a single-family home, with inspections every four months).

What does the state require in Angelina County?

The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.

What should the site plan show?

ANRA’s review rests on the site evaluation and design, which depend on where the home, the septic tank and field, any well and the property lines sit. A site plan with those distances keeps the evaluator, designer and installer on the same layout. Stampd draws site plans for manufactured home placements.

More help with Texas placements

The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.

FAQ

Common questions

Who issues septic permits in Angelina County, Texas?

The Angelina & Neches River Authority (ANRA), the TCEQ's authorized agent for septic systems in Angelina County, San Augustine County and the regulated zone around Sam Rayburn Reservoir. ANRA's OSSF Department is at 2901 N John Redditt Drive, Lufkin, TX 75904 (936-632-7795).

How do I get an ANRA Permit to Construct a septic system?

A TCEQ-licensed site evaluator assesses the property; a registered sanitarian or professional engineer drafts the site design; if an aerobic system is needed, two notarized affidavits to the public are prepared, one filed with the County Clerk and one with ANRA. The application packet includes the completed application, the fee, and originals of the site evaluation, site design, affidavit and aerobic information sheet.

How much is a septic permit in Angelina County?

ANRA's fees effective May 1, 2025 are $485 for a single-family residential system ($475 plus the $10 TCEQ fee), $610 for light non-single-family systems and $1,510 for heavy ones. A re-inspection is $250, a re-design $175 and a license transfer $35.

How long does an ANRA septic permit take?

ANRA says it can usually issue a Permit to Construct within days, though state law allows up to 30 days. The permit is valid for one calendar year. The installer must request an inspection at least five working days ahead, and a License to Operate is issued after the inspection.

What does an aerobic septic system require in Angelina County?

The state requires a service contract with a licensed professional for the life of an aerobic system and annual testing, unless the owner qualifies for the single-family residential exemption. Even then, a service contract is required for the first two years, with inspections every four months.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Sources

Every fact on this page comes from one of these, checked on November 23, 2026. Rules and fees change; confirm with the office before you submit. This page is general information, not legal advice.

  1. Angelina & Neches River Authority, OSSF Overview and fee schedule
  2. Angelina & Neches River Authority, OSSF Permits & Licensing
  3. TDHCA, Manufactured Housing installation records Installations reported in Angelina County, January to December 2025