Who issues the permit in Guadalupe County?
For property outside city limits, the Guadalupe County Environmental Health Department handles the permits a placement usually needs.
Environmental Health, 310 IH 10 West, Seguin, TX 78155. 830-303-8858.
| Permit | When | Fee |
|---|---|---|
| Septic (OSSF), residential conventional | A new system, before construction starts | $400 |
| Septic (OSSF), residential advanced treatment | A new aerobic or other advanced system | $500 |
| Septic, multi-unit or rental community | Multi-unit, rental communities, condos, commercial | $600 |
| Septic connection, alteration, expansion or repair | Connecting to or changing an existing system | $200 each |
| Floodplain development | Any development in the regulated floodplain | $300 |
Fees are from the schedule approved in March 2025 and revised October 23, 2025. Construction without an issued permit pays double the permit fee. Replacing a tank or drain field counts as a repair and needs a permit for the whole system.
Property inside a city, such as Seguin, Schertz or Cibolo, follows that city’s rules.
How does the septic permit work?
The county says all new construction and repairs to septic systems must have an approved permit before construction starts. Two things will get an application rejected:
- a floodplain development permit is required and has not been issued
- the property does not comply with the Guadalupe County Subdivision Regulations
Check the floodplain and the plat status first, then file the septic application.
How does the floodplain permit work?
Before new construction or any activity on property in the regulated floodplain, the county floodplain manager must issue a permit. There are five steps:
- Application. The floodplain development application, checklist and required documents.
- Site inspection. The floodplain manager visits to set the floodplain requirements, check the property boundaries and existing structures, and approve the engineered design. Once the permit is issued, construction must start within 180 days.
- Field inspections during construction. Work in violation gets a written stop work order. Continuing while the order is in place is a Class C misdemeanor.
- Final inspection.
- Certificate of compliance.
The application packet includes a manufactured home structure type and a cost-of-reconstruction affidavit that is notarized at the department.
What does the state require in Guadalupe County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
In Guadalupe County, the septic review and the floodplain review both turn on where the home, the septic system and the floodplain boundary sit relative to the property lines. A site plan that shows all three, with distances, lets both reviews use the same layout. Stampd draws site plans for manufactured home placements.