Who issues the permit in Walker County?
Outside city limits, Walker County Planning & Development issues development permits, septic permits, floodplain reviews and 911 addresses.
| Office | Address | Phone |
|---|---|---|
| Planning & Development | 1313 University Ave, Huntsville, TX 77340 | 936-436-4939 |
Permits are processed Monday to Friday, 8:00 to 11:30 am and 1:00 to 4:30 pm. Allow 30 to 45 minutes.
Every development needs a development permit, issued before construction under the county’s floodplain regulations. A septic permit application must include a development permit application.
In the City of Huntsville’s ETJ, get a certificate of compliance from the city before applying. The county cannot permit the development without it.
What do you need to apply?
From the county’s list of items required for a permit:
- A valid 911 address. About 7 to 10 business days. Someone must come in to pick up a wooden stake and place it at the proposed or existing driveway.
- A copy of the deed, warranty or gift deed only, with the volume and page stamped on it. A deed of trust is not accepted. Copies are in the Deed Records Room, Walker County Courthouse, Room 103.
- Photo ID. Only the owner named on the deed can apply, unless the owner gives notarized permission.
- A site drawing showing where the home will go, with the road labeled, the direction of north, and two perpendicular measurements in feet, to scale.
- A floor plan of the home.
- The fee by check, money order or credit card. No cash.
- A certificate of compliance from Huntsville, if in its ETJ.
| Fee | Amount |
|---|---|
| Development permit, single-family residential | $100 |
| Septic (OSSF) permit, single-family residential | $210 |
| Affidavit to the Public for an aerobic system (check to the County Clerk) | $26 |
The application and any permit issued on it expire 180 days from submittal or issuance unless extended in writing.
How does the septic process work?
Walker County calls it a three-step process: application, Authorization to Construct, and Notice of Approval after a satisfactory inspection.
- The county has 5 business days from receiving all paperwork to pass or reject a submittal. A rejection restarts the clock.
- Inspections must be booked at least 24 hours ahead by the installer, and a level must be set up on site.
- Septic applications expire 6 months from issue or 1 year from the Authorization to Construct.
- An aerobic system serving an owner-occupied home can be maintained by the homeowner only if every disposal area is at least 50 feet from all property lines.
- Using or building a system without approval can bring fines of $200 a day.
What does the state require in Walker County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
Walker County asks for a scaled site drawing with the road labeled, north, and two perpendicular measurements locating the home. A site plan for a Walker County placement should also show the property boundaries, the driveway where the 911 stake goes, the septic tank and drain field with distances to the property lines, and any flood hazard area. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.