Who issues the permit in Mason County?
Outside the City of Mason, the Mason County OSSF Designated Representative handles septic permits and the floodplain determination.
| Office | Phone | Hours |
|---|---|---|
| Mason County OSSF Designated Representative | 325-347-2477 | 8:00 am to 5:00 pm, Monday to Friday |
Mason County’s septic rules say that regardless of the size or number of acres, every new septic system must be permitted.
How does the septic permit work?
From the county’s packet (updated October 2024):
- Get the application forms from the Designated Representative.
- Have the right person, usually the installer, complete them.
- Submit the forms and the fee.
- The county reviews the application and the floor or construction plans. The floor plan must show the number of bedrooms, number of restrooms, square footage and whether a water softener will be installed.
- On approval, an Authorization to Construct is issued, valid for one year.
- Build the system. Book the inspection at least 5 working days ahead; it must happen before the system is covered.
- After a successful inspection, a Notice of Approval is issued in about 5 working days, once all fees are paid.
| Fee | Amount |
|---|---|
| Single-family residence | $210 |
| All other systems (commercial, multi-family) | $410 |
| Re-inspection | Half the permit fee |
Fees are non-refundable and paid by personal check, cashier’s check or money order, payable to Mason County. No cash.
What goes in the design package?
- Site evaluation: at least two soil borings or backhoe pits at opposite ends of the proposed disposal area, dug 2 feet below the proposed excavation.
- Planning materials: a scale drawing of the system showing every structure it serves, prepared from the site evaluation.
- Site drawing on the soil evaluation form, at 1 inch = 50 feet or another suitable scale.
- The application asks for the 911 site address, the legal description and plat date (or acreage and survey name), directions to the site and the water source.
What about the floodplain?
The same packet includes a floodplain section for the county Floodplain Administrator, who records whether the property is in an identified flood hazard area. If it is, the applicant must supply one copy of the plans and specifications of the proposed construction.
What does the state require in Mason County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
Mason County reviews a scale drawing of the septic system with every structure it serves. A site plan that shows the property lines, the home, the tank and drain field, the soil boring locations, any water well and the flood zone boundary gives the site evaluator, the installer and the county one layout to work from. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.