Mason County, Texas

Manufactured home permits in Mason County, Texas

Sources last checked

Mason County requires a septic (OSSF) permit for every new system, regardless of acreage. The Mason County OSSF Designated Representative issues it: $210 for a single-family residence, paid by check or money order, no cash. The packet includes a floodplain section, and a home in a flood hazard area needs one copy of the plans and specifications.

manufactured homes installed in Mason County in 2025 (TDHCA installation records)
16
Mason County single-family septic (OSSF) permit; re-inspections are half the permit fee
$210
every new septic system in Mason County needs a permit, regardless of the size of the property
Any acreage
Get a quote for Mason County For dealers and installers

Who issues the permit in Mason County?

Outside the City of Mason, the Mason County OSSF Designated Representative handles septic permits and the floodplain determination.

Office Phone Hours
Mason County OSSF Designated Representative 325-347-2477 8:00 am to 5:00 pm, Monday to Friday

Mason County’s septic rules say that regardless of the size or number of acres, every new septic system must be permitted.

How does the septic permit work?

From the county’s packet (updated October 2024):

  1. Get the application forms from the Designated Representative.
  2. Have the right person, usually the installer, complete them.
  3. Submit the forms and the fee.
  4. The county reviews the application and the floor or construction plans. The floor plan must show the number of bedrooms, number of restrooms, square footage and whether a water softener will be installed.
  5. On approval, an Authorization to Construct is issued, valid for one year.
  6. Build the system. Book the inspection at least 5 working days ahead; it must happen before the system is covered.
  7. After a successful inspection, a Notice of Approval is issued in about 5 working days, once all fees are paid.
Fee Amount
Single-family residence $210
All other systems (commercial, multi-family) $410
Re-inspection Half the permit fee

Fees are non-refundable and paid by personal check, cashier’s check or money order, payable to Mason County. No cash.

What goes in the design package?

  • Site evaluation: at least two soil borings or backhoe pits at opposite ends of the proposed disposal area, dug 2 feet below the proposed excavation.
  • Planning materials: a scale drawing of the system showing every structure it serves, prepared from the site evaluation.
  • Site drawing on the soil evaluation form, at 1 inch = 50 feet or another suitable scale.
  • The application asks for the 911 site address, the legal description and plat date (or acreage and survey name), directions to the site and the water source.

What about the floodplain?

The same packet includes a floodplain section for the county Floodplain Administrator, who records whether the property is in an identified flood hazard area. If it is, the applicant must supply one copy of the plans and specifications of the proposed construction.

What does the state require in Mason County?

The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.

What should the site plan show?

Mason County reviews a scale drawing of the septic system with every structure it serves. A site plan that shows the property lines, the home, the tank and drain field, the soil boring locations, any water well and the flood zone boundary gives the site evaluator, the installer and the county one layout to work from. Stampd draws site plans for manufactured home placements.

More help with Texas placements

The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.

FAQ

Common questions

Does a manufactured home need a septic permit in Mason County, Texas, on a large tract?

Yes. Mason County's septic rules, amended Section 10(a), say that regardless of the size or number of acres in the property, all new on-site sewage facilities must be permitted.

Who issues septic permits in Mason County?

The Mason County OSSF Designated Representative, reachable at 325-347-2477, 8:00 am to 5:00 pm, Monday to Friday. Mason County is TCEQ's authorized agent for septic systems.

How much is a Mason County septic permit?

The October 2024 packet lists $210 for a single-family residence and $410 for all other systems, such as commercial or multi-family. Each re-inspection costs half the permit fee. Fees are non-refundable and paid by personal check, cashier's check or money order, payable to Mason County. No cash.

What does Mason County review with a septic application?

The application and the floor or construction plans. The floor plan must show the number of bedrooms, the number of restrooms, the square footage, and whether a water softener will be installed. The package also needs a site evaluation with at least two soil borings or backhoe pits and a scale drawing of the system showing every structure it serves.

How long does a Mason County septic permit take?

Once the application and plans are approved, an Authorization to Construct is issued, valid for one year. Book the inspection at least 5 working days ahead; it must happen before the system is covered. A Notice of Approval follows in about 5 working days after a successful inspection, once all fees are paid.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Sources

Every fact on this page comes from one of these, checked on November 24, 2026. Rules and fees change; confirm with the office before you submit. This page is general information, not legal advice.

  1. Mason County, Sanitation & Floodplain
  2. Mason County, How to obtain an On-Site Sewage Facility permit (packet updated October 2024)
  3. Mason County, Rules for On-Site Sewage Facilities
  4. TDHCA, Manufactured Housing installation records Installations reported in Mason County, January to December 2025

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077