Parker County, Texas

Manufactured home permits in Parker County, Texas

Sources last checked

Parker County does not issue building permits or certificates of occupancy outside city limits. A manufactured home placement still needs a septic (OSSF) permit from the county where a septic system is built, and a floodplain development permit if the home is placed in the regulatory floodplain. Inside a city such as Weatherford, the city's own permits apply.

manufactured homes installed in Parker County in 2025 (TDHCA installation records)
135
Parker County septic (OSSF) permit fee in the county's 2025 permitting requirements
$480
county building permit or certificate of occupancy for homes outside city limits
No
Get a quote for Parker County For dealers and installers

Who issues the permit in Parker County?

Parker County does not issue building permits or certificates of occupancy. For a manufactured home outside city limits, Parker County Permitting handles the two permits that usually apply:

Permit When
Septic (OSSF) permit Where a septic system is built. $480 in the county’s 2025 permitting requirements
Floodplain development permit Placing any structure in the regulatory floodplain

Inside a city, such as Weatherford, Aledo or Springtown, the city’s permits apply instead.

How does the septic permit work?

Septic systems in Parker County are permitted under TCEQ’s Chapter 285 rules, through the county’s on-site sewage facility application. The county’s permitting requirements, updated June 2025, list a fee of $480, payable in cash, check or money order.

When is a floodplain permit needed?

Parker County says the placement of any structure within the regulatory floodplain must follow the county floodplain regulations and needs a completed and approved floodplain development permit. Check the parcel against the flood maps before ordering the site plan.

What does the state require in Parker County?

The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.

What should the site plan show?

With no county building permit, Parker County’s reviews are the septic design and, in the floodplain, the floodplain permit. Both depend on where the home, the septic system and the flood zone boundary sit relative to the property lines. A site plan showing all of them, with distances, serves both. Stampd draws site plans for manufactured home placements.

More help with Texas placements

The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.

FAQ

Common questions

Does a manufactured home need a building permit in Parker County, Texas?

No county building permit. Parker County says it does not issue building permits or certificates of occupancy. A placement outside city limits still needs a septic (OSSF) permit where a septic system is built, and a floodplain development permit if the home is in the regulatory floodplain.

How much is a Parker County septic permit?

The county's permitting requirements updated in June 2025 list a permit fee of $480, payable in cash, check or money order. Septic systems are permitted under the TCEQ Chapter 285 rules through the county's on-site sewage facility application.

When is a floodplain development permit needed in Parker County?

Parker County says the placement of any structure within the regulatory floodplain must follow the county floodplain regulations and needs a completed and approved floodplain development permit.

Who handles permits in Parker County?

Parker County Permitting, which handles septic and floodplain development permits for unincorporated areas. Its office is reported at 1114 Santa Fe Drive, Weatherford (817-598-6175); confirm before visiting.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Sources

Every fact on this page comes from one of these, checked on November 23, 2026. Rules and fees change; confirm with the office before you submit. This page is general information, not legal advice.

  1. Parker County, Permitting
  2. Parker County, Permitting Requirements (updated June 13, 2025)
  3. Parker County, Floodplain Development Requirements
  4. TDHCA, Manufactured Housing installation records Installations reported in Parker County, January to December 2025

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077