Who issues the permit in San Jacinto County?
For property outside city limits, the San Jacinto County Permit Department and 9-1-1 Addressing handles septic (OSSF), development and pipeline permits, and 911 addresses.
Permit Department, 1 State Hwy 150, Room 3, Coldspring, TX 77331. 936-653-3823.
The office is open Monday to Thursday 8:00 am to 4:30 pm, closed noon to 1:00 pm, and Friday 8:00 am to noon. Staff work in the field from 1:00 pm to 4:30 pm. Payments can be made online, but the county asks you to call first for the correct price.
What are the fees?
From the fee table on the county’s permit application:
| Permit | Fee |
|---|---|
| 911 address | $25 |
| Development, outside the floodplain | $250 |
| Development, in the floodplain | $500 |
| Development, commercial | $750 |
| Septic (OSSF), residential | $310 |
| Septic (OSSF), commercial | $410 |
| Septic (OSSF), repair | $100 |
| Utility | $55 |
Allow 7 to 10 working days for processing.
What does the application ask for?
One application covers the 911 address, the development permit and the septic permit. It asks for:
- the applicant, mailing address, 911 address, subdivision or tract, acreage, directions and precinct
- whether any part of the property, or the building site, is in the floodplain, and the base flood elevation if known
- the septic situation: central, existing, holding tank, proposed or ten-acre, and whether a homeowner or an installer will put it in
- the water source (community or well), the electric provider and whether the site is inside city limits
- the home: single-wide or double-wide, square footage, occupants, bedrooms and bathrooms, and whether it has a garbage disposal, washing machine or dishwasher
The county’s guidelines add paperwork when the property is in the floodplain, has an existing septic system, was divided out of another property, or is not in the applicant’s name.
By signing, the owner lets the county enter the property for lot evaluation, septic inspections and flood hazard evaluation. If any part of the property is in the 100-year floodplain, the applicant must build outside it or follow the NFIP and county floodplain rules.
What does the state require in San Jacinto County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
The development permit fee and the septic design both turn on where the home sits. Show the home, the septic system and its field, any well, the driveway, the property lines and any part of the lot in the floodplain. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.