Who issues the permit in Hill County?
For septic systems in unincorporated Hill County, Hill County Development Services.
Development Services, Support Services Building, 218 N. Waco St., Hillsboro, TX 76645. 254-283-6846. Monday to Friday, 8:00 am to 4:30 pm.
This changed on January 1, 2026. Septic permits used to be filed at the Tax Office and reviewed by the Sheriff’s Environmental Compliance Unit. Older forms with that process are out of date.
The county page currently says payments to Development Services must be made by cash or check until further notice. After the fee is paid, inspections are coordinated by the Development Services OSSF designated representative.
Hill County’s website also has a 911 addressing, signage and culvert page. Check the 911 address and any culvert needs before applying.
What does the septic application ask for?
The 2026 Application for Authorization to Construct asks for:
- the deeded owner, mailing address and contact details
- the 911 site address
- a legal description with proof, such as a deed or survey, and the appraisal district property ID
- the water source: well or a named water provider
- whether the building is new or existing, and site-built or manufactured
- the square footage and number of bedrooms
- whether it is a new system, a replacement, a new tank, or a re-hook to a new structure
- the site evaluator and the installer, with license numbers
The system must be installed to the design attached to the application. By signing, the owner lets Development Services enter the property for site evaluation.
Fees and timing
| Item | Hill County |
|---|---|
| Septic (OSSF) fee | $600 for all septic systems |
| Authorization to Construct | Valid one year from issue, unless revoked |
| Commercial and RV parks | Also need TCEQ approval, which the county says can cause substantial delays |
What does the state require in Hill County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
The septic design depends on where the home, the system and its field or spray heads, any well, the driveway and culvert, and the property lines sit. Show them with distances, along with any part of the lot in a mapped flood zone. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.