Grimes County requires a development permit for all development in its unincorporated areas, and its application lists a manufactured home as its own type. The application asks for a site plan of the entire property and a floodplain check. Where there is no public sewer, a septic (OSSF) permit costs $420 for a home. Since January 21, 2026, permanent power cannot be connected until the county issues a Certificate of Compliance.

manufactured homes installed in Grimes County in 2025 (TDHCA installation records)
122
Grimes County floodplain development permit fee in Zone A or the FEMA BLE 1% flood extent; no fee in Zone X
$103
Grimes County residential septic (OSSF) permit fee ($624 commercial)
$420
Get a quote for Grimes County For dealers and installers

Who issues the permit in Grimes County?

For property outside city limits, Grimes County Development Services issues the development permit.

Development Services, 270 FM 149 W, Anderson, TX 77830. 936-873-6465. Applications can also be emailed.

Grimes County says a development permit is required for all development in its unincorporated areas. Its application lists Residential - Manufactured Home as its own development type. Only the property owner or their legal representative can apply.

Septic permits come from the Grimes County Environmental Department, 1170 CR 280, Anderson, TX 77830. 936-873-4495.

Power waits for the permit. A Commissioners Court order of January 21, 2026 says permanent electric service cannot be connected to any structure or development site until Grimes County issues a Certificate of Compliance. The county publishes an Electric Permit Request form.

What does the development permit application ask for?

Item What Grimes County asks for
Owner or legal representative Name and contact details
Location Address, appraisal district property ID (R number), acreage, and subdivision, lot and block if any
Development type Residential - Manufactured Home
Water and sewer Public water or private well; public sewer or on-site septic. A letter of intent to serve is required for public water or sewer
Electric Existing or available nearby, with an intent to serve letter
Site plan A site plan, drawing or hand-drawn sketch of the entire property and the proposed development
Floodplain check Whether the property and the structure are in Zone A on the FEMA map, or in the 1% flood extent on FEMA’s Base Level Engineering (BLE) viewer

The county’s checklist also lists a driveway permit as required before the floodplain development permit is approved, and the floodplain page says all other permits must be issued first.

What changes if the property is in the floodplain?

Zone A or BLE 1% flood extent Zone X
Fee $103 No fee
Elevation certificate, civil plans, inspection Required Not required
Lowest finished floor 2 ft above the base flood elevation, the crown of the adjacent road, or the highest adjacent grade, whichever is higher 12 in above the highest adjacent grade measured 10 ft from the slab edge, or 12 in above the street crown, whichever is higher
Other Utilities at or above the required floor. Property survey, surveyor’s certification of the finished floor and engineer-sealed plans. No elevating on fill where the flood depth is 3 ft or more Properties sloping away from the road are exempt from the crown rule but must keep drainage paths around the structure

Few places in Grimes County have detailed flood studies. The county says an engineer or surveyor can set the base flood elevation from the FEMA study, FEMA’s simplified methods, or the BLE viewer report, which is attached to the application.

What does a septic (OSSF) permit need?

The Environmental Department lists seven steps:

  1. A certified site evaluator does a site and soil evaluation and report.
  2. The right system is chosen from that evaluation.
  3. A system design is drawn and submitted with the site and soil report.
  4. The application is filed with those documents and the fee: $420 residential or $624 commercial. Aerobic systems also need an Affidavit to the Public, signed, notarized and filed with the County Clerk ($25 for one page).
  5. The county reviews the package and issues an Authorization to Construct.
  6. A TCEQ-licensed installer builds the system to the approved plans.
  7. The county inspects it and issues a Notice of Approval.

What does the state require in Grimes County?

The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.

What should the site plan show?

Grimes County asks for a site plan of the entire property with the proposed development, and its application includes an example page. Show the home, the driveway, the septic system, any well, the property lines and any part of the lot in Zone A or the BLE flood extent. Stampd draws site plans for manufactured home placements.

More help with Texas placements

The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.

FAQ

Common questions

Does a manufactured home need a permit in Grimes County, Texas?

Yes. Grimes County says a development permit is required for all development in the unincorporated areas, and its application lists Residential - Manufactured Home as a development type. Only the property owner or their legal representative can apply. Applications go to Grimes County Development Services, 270 FM 149 W, Anderson, TX 77830 (936-873-6465), in person or by email.

Can power be connected before the Grimes County permit is approved?

No. A Commissioners Court order of January 21, 2026 says no one may have permanent electric service connected to a structure or development site in unincorporated Grimes County until the county issues a Certificate of Compliance. The county also publishes an Electric Permit Request form.

What does the Grimes County development permit cost?

The floodplain part depends on the flood zone. In Zone A or the FEMA Base Level Engineering 1% flood extent, an elevation certificate, civil plans and an inspection are required and the permit fee is $103. In Zone X, none of those are required and there is no permit fee.

How do I get a septic (OSSF) permit in Grimes County?

The Grimes County Environmental Department, 1170 CR 280, Anderson (936-873-4495), lists seven steps: a certified site evaluator does a site and soil evaluation, a system is chosen and designed, the application is filed with the evaluation, the design and a $420 residential fee ($624 commercial), the county issues an Authorization to Construct, a TCEQ-licensed installer builds the system, and the county inspects it and issues a Notice of Approval. Aerobic systems also need a notarized Affidavit to the Public filed with the County Clerk.

How high must a home sit in Grimes County?

In Zone A or the BLE 1% flood extent, the lowest finished floor must be 2 feet above the base flood elevation, 2 feet above the crown of the adjacent road, or 2 feet above the highest adjacent grade, whichever is higher, and utilities must be at or above that floor. In Zone X, the lowest finished floor must be 12 inches above the highest adjacent grade measured 10 feet from the slab edge, or 12 inches above the crown of the adjacent street, whichever is higher.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Sources

Every fact on this page comes from one of these, checked on November 23, 2026. Rules and fees change; confirm with the office before you submit. This page is general information, not legal advice.

  1. Grimes County, Development Services
  2. Grimes County, Development Permit Application
  3. Grimes County, Floodplain Administrator
  4. Grimes County Environmental Department, Seven Steps to Obtaining a Permit and Approved On-Site Sewage Facility
  5. TDHCA, Manufactured Housing installation records Installations reported in Grimes County, January to December 2025

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077