Who issues the permit in Tyler County?
It depends on where the property is.
| Where | What is required | Contact |
|---|---|---|
| Unincorporated Tyler County and the communities outside Woodville (Chester, Colmesneil, Doucette, Warren, Hillister, Spurger, Fred) | No county building permit, as long as electrical and water service exist | Check with SHECO or Entergy that the service can handle the home |
| City of Woodville | Building code officer inspection before any construction | 409-283-2234 |
| City of Ivanhoe | Electrical permit from city hall, signed by the electric provider | 409-283-3299 |
| Wildwood/Village Mills | Its own requirements | 409-834-2241 |
A disconnected meter needs a new permit. If a residence’s electrical box was disconnected for any reason, including non-payment, a new electrical permit is required anywhere in the county. It comes from the Emergency Management Office, 201 Veterans Way, Woodville, TX 75979.
Is a floodplain permit needed?
Only in a FEMA Special Flood Hazard Area in the unincorporated county. The Floodplain Management Office of the Tyler County Emergency Management Department decides whether the location is in one.
Tyler County’s floodplain ordinance covers the elevation of construction above the base flood elevation, the effect on drainage and other flooding issues. It does not cover construction quality, materials or contractor licensing. Woodville, Ivanhoe, Colmesneil and Chester have similar ordinances inside their limits.
The county notes that having no local permit does not rule out state or federal permits, such as from TCEQ.
What about two or more homes on one tract?
Two or more spaces rented or leased for less than 30 months, without a purchase option, make a manufactured home rental community. Under a Commissioners Court order of April 28, 2021, construction cannot begin until an Infrastructure Development Plan is approved. The order recommends meeting the precinct commissioner and the county engineer before submitting a plat.
What does the state require in Tyler County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
With no county building permit, the site plan matters most for the septic design and any flood zone review. Show the home, the septic system and its field, any well, the driveway and the property lines, and mark any part of the lot in a FEMA flood zone. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.