Washington County, Texas

Manufactured home permits in Washington County, Texas

Sources last checked

Washington County Environmental Health, part of Engineering and Development Services in Brenham, permits septic systems county-wide and floodplain development in the unincorporated area. Every new septic system needs a permit before work begins, regardless of acreage. Under the county's 2025 septic rules, lots created since the order took effect need at least 1 acre with public water or 1.5 acres without. Apply online through MGO.

manufactured homes installed in Washington County in 2025 (TDHCA installation records)
60
minimum for a new lot on public water and septic under Washington County's 2025 rules; 1.5 acres without public water
1 acre
every new, altered, repaired or enlarged septic system needs a Washington County permit, regardless of acreage
Any size
Get a quote for Washington County For dealers and installers

Who issues the permit in Washington County?

Washington County Environmental Health, a division of Washington County Engineering and Development Services.

Environmental Health, 3650 Highway 36 North, Brenham, TX 77833. 979-277-6290. 7 am to 4 pm, Monday to Friday.

Permit Where it applies
Septic (OSSF) Throughout Washington County
Floodplain determination and development Unincorporated Washington County

Septic and floodplain permits are applied for online through the county’s MGO process. Subdivisions and other developments are run by Engineering and Development Services, with Environmental Health reviewing the floodplain and septic parts.

What are the septic rules?

Washington County adopted stricter rules than the state minimum. TCEQ approved the county order in July 2025.

  • Every new, altered, repaired or extended septic system needs a permit, regardless of acreage. Pumping does not.
  • Lot minimums for lots created on or after the order took effect, without central sewer: 1 acre with a public water system, 1.5 acres without.
  • More than one dwelling or RV per acre on septic: at most 440 gallons per day per acre, with a usable reserve area equal to all disposal areas.
  • A tiny home, cabin, casita, park model RV or similar is sized as a single-family dwelling.
  • Holding tanks cannot be used where there is more than one dwelling, RV or similar structure.
  • Existing tanks reused in a new system must have been pumped in the last five years, with the manifest by final inspection.
  • Spray areas must be at least 25 feet from foundations, buildings, property lines and pools, and 75 feet from streams, ponds and other waterways. Sprinklers spray between midnight and 5 am.
  • The county will not issue an Authorization to Construct if the site does not conform to county regulations.

The review clock starts only when the application, all planning materials and the fee are in. A $10 state fee is added to each permit.

Is a floodplain permit needed?

Washington County takes part in the National Flood Insurance Program, so a permit is required before any development relating to the floodplain begins in the unincorporated county. Submit the application, fee and planning materials to Environmental Health. The floodplain can be checked on the county’s web map.

What does the state require in Washington County?

The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.

What should the site plan show?

The septic review checks distances and acreage, and spray areas have set distances from buildings and property lines. Show the home, the septic system and its spray or drain field, any well, the property lines, the lot size and any floodplain. Stampd draws site plans for manufactured home placements.

More help with Texas placements

The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.

FAQ

Common questions

Who issues septic permits in Washington County, Texas?

Washington County Environmental Health, a division of Washington County Engineering and Development Services, 3650 Highway 36 North, Brenham, TX 77833 (979-277-6290), 7 am to 4 pm Monday to Friday. It permits septic systems throughout the county. Applications for septic and floodplain permits go through the county's online MGO process.

Does a septic system on a large tract need a permit in Washington County?

Yes. Washington County requires a permit for each new, altered, repaired or extended septic system regardless of acreage, so the state's ten-acre exemption does not apply. Routine maintenance such as pumping does not need a permit.

What lot size does Washington County require for a septic system?

Under the county's septic rules approved by TCEQ in July 2025, lots created on or after the order's effective date without central sewer must be at least 1 acre if served by a public water system, or 1.5 acres if not. More than one dwelling or RV per acre on septic is limited to 440 gallons per day per acre with a reserve area.

Are manufactured homes and tiny homes treated the same for septic in Washington County?

The county's rules say a tiny home, cabin, casita, cottage, park model RV or similar structure is sized as a single-family dwelling. Holding tanks cannot be used on property with more than one dwelling, RV or similar structure.

When is a floodplain permit needed in Washington County?

Before any development related to the floodplain begins in unincorporated Washington County, because the county participates in the National Flood Insurance Program. The application, fee and planning materials go to Environmental Health for review and authorization before work starts.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Sources

Every fact on this page comes from one of these, checked on November 23, 2026. Rules and fees change; confirm with the office before you submit. This page is general information, not legal advice.

  1. Washington County Environmental Health
  2. Washington County, Order Adopting Rules for On-Site Sewage Facilities (TCEQ approval letter July 22, 2025)
  3. TDHCA, Manufactured Housing installation records Installations reported in Washington County, January to December 2025

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077