Who issues the permit in Coryell County?
| What | Who | Contact |
|---|---|---|
| Septic (OSSF) permits | County septic representative | 254-213-6601 |
| Records of existing septic systems | County Judge’s office | 254-865-5911, ext. 301 |
| Floodplain development permits | Coryell County Floodplain Administrator | Via the county OSSF office |
| Driveways, culverts and subdivisions | Development and Permitting Department, 3701 US Hwy 84 West, Gatesville, TX 76528 | 254-213-6601 |
Is a septic permit needed?
Yes, on any size of tract. Coryell County requires every new, altered, extended or repaired septic system to be permitted and inspected regardless of tract size. Only systems installed before September 1, 1989 are grandfathered.
Is a floodplain permit needed?
For development in a flood hazard area, yes. The development permit application asks for:
- the subdivision, section, block and lot, or the survey, abstract and acreage
- a vicinity map
- the nature of the development (residential, fill, new construction)
- in a floodplain, one copy of the plans and specifications and copies of other permits
The Floodplain Administrator records the FIRM zone, panel and base flood elevation. An approved permit is valid for one year.
What about the driveway?
A driveway onto a county road needs a permit (form version 6-8-21):
- Apply to Development and Permitting. With no address yet, stake a ribbon at the center of the proposed culvert.
- A Road and Bridge representative visits and sets the culvert diameter and length. 24 feet is the shortest allowed.
- Sign and keep the copy with the size before buying the pipe.
- Install within six months, or the application is void.
Culverts are 16-gauge galvanized corrugated metal pipe, with flex base or caliche fill and at least 6 inches of compacted fill on top. Call Texas 811 before digging.
What does the state require in Coryell County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
The septic design, any floodplain permit and the culvert all depend on where things sit. Show the home, the septic system and its field, any well, the driveway and culvert, the property lines and any flood hazard area. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.