Who issues the permit in Waller County?
For septic systems in unincorporated Waller County, the Waller County Environmental Division.
Environmental Division, 425 FM 1488, Hempstead, TX 77445. 979-921-0391. Open Monday to Thursday 7:00 am to 4:30 pm and Friday 8:00 am to noon, including lunch.
The county says to contact the Environmental Division for permit requirements before installing a private septic system, and warns that breaking the rules can bring civil and criminal penalties.
Inside the Town of Pine Island, the town now processes septic permits itself. Contact the town directly.
Other county approvals, such as development, driveway and floodplain permits, go through other offices. Check them before ordering anything.
How do you apply?
Online, through MGO Connect:
- Select Texas - Waller County as the jurisdiction.
- Choose Apply Online for an Environmental Permit.
- Create an account or log in.
- Select On-Site Sewage Facility - Residential.
- Enter the R number or property ID from the Waller County Appraisal District, found on the tax bill.
Submit everything the application asks for at once; the county says missing information delays processing. Instructions are also available in Spanish.
What are the fees?
From the Waller County Environmental Fees schedule, effective January 1, 2020:
| Permit | Fee |
|---|---|
| Single-family residence (one dwelling: house, manufactured home, RV or barndominium), including application, permit, inspections and notice of approval | $310 |
| Commercial or non-single-family system | $510 |
| Re-inspection, single-family (system not ready or failed) | $150 |
| Re-design after the application is submitted | $75 |
| Minor repair, single-family | $175 |
| Major repair or replacement, single-family | $310 |
All fees double for construction that starts before the permit, including the minimum and maximum fees. Fees are non-refundable, and re-inspection fees are due before the re-inspection.
What does the state require in Waller County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
The septic design depends on where the home, the system and its field or spray area, any well, the driveway and the property lines sit. Show them with distances, along with any part of the lot in a mapped flood zone. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.