Who issues the permit in Potter County?
For septic systems, the Amarillo Area Public Health District. Its Environmental Health Department is the permitting authority for septic (OSSF) systems in Potter and Randall counties, under a county order in each.
Environmental Health, 808 S. Buchanan St., Amarillo. 806-378-9472.
A permit is required to install, repair, replace or alter a septic system anywhere in Potter County. Applications go by email, in person or by mail, and the fee is paid when you submit.
Property inside Amarillo or another city follows that city’s rules.
Step 1: the 911 address
Every property with a septic system must have a 911 address, and more than one may be needed for several buildings.
| Where the property is | Who assigns the address | Phone |
|---|---|---|
| Outside Amarillo’s city limits and one-mile ETJ | Potter-Randall 9-1-1 Emergency Communications District | 806-374-9800, ext. 109 |
| Inside Amarillo or its one-mile ETJ | City of Amarillo Building Safety Department | 806-378-3041 |
Step 2: check the lot
| Rule | Potter County septic requirement |
|---|---|
| Minimum lot, private well | 1 acre |
| Minimum lot, public water | Half an acre |
| Exceptions | Lots platted before 1988 may be exempt |
| Plat | Required under 5.01 acres inside Amarillo’s ETJ, or under 10.01 acres outside it, unless an exemption applies |
Step 3: the septic application
The October 2025 application asks for the owner and installer, the 911 address, the appraisal district property ID and lot size, the water source, the daily flow, the soil class, the square footage and the number of bedrooms. It also asks whether the tank and drainfield can meet these minimum distances:
| From | Tank | Drainfield |
|---|---|---|
| Public wells | 50 ft | 150 ft |
| Your and neighbors’ wells | 50 ft | 100 ft |
| Water lines | 10 ft | 10 ft |
| Property lines | 5 ft | 5 ft |
| Lakes, streams, ponds and creeks, including dry ones | 50 ft | 75 ft |
| Foundations, buildings, surface improvements and pools | 5 ft | 5 ft |
| Overhead and underground easements | 1 ft | 1 ft |
If any distance cannot be met, a signed variance request and a design by a registered sanitarian or professional engineer are required.
Documents that go with it:
- a scaled site plan showing the property layout and the planned system location
- a floor plan with the bedrooms and living area
- a site evaluation by a licensed site evaluator
- a vicinity map, for properties over 5 acres
- for aerobic systems, a two-year maintenance contract and a recorded affidavit
Systems in a flood zone or floodway must be designed by a professional engineer. Homeowners may install a system for their own single-family home; rentals, leased homes and commercial sites need a licensed installer.
Timing
The Authorization to Construct is valid for one calendar year, and the system must pass inspection in that time or a new permit is needed. Inspections are booked by phone the day before. The operating permit issued after inspection does not expire while the system is used as approved.
What does the state require in Potter County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
The health district asks for a scaled site plan with the property layout and the planned septic system, and it publishes a sample. Show the home, the tank and drainfield, wells, water lines, easements and property lines with the distances above. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.