Who issues the permit in San Saba County?
One county office handles both floodplain management and septic (OSSF) permits:
| Office | Address | Phone |
|---|---|---|
| Floodplain Management and On-Site Sewage Facility | 500 E. Wallace, Suite 111, San Saba, TX 76877 | 325-372-8570 or 325-372-5600 |
Physical (911) addresses are handled through the County Judge’s office. Property inside the City of San Saba may follow the city’s rules instead.
What does the development permit ask for?
The county’s development permit application lists manufactured homes as a type of construction and asks for:
- the owner, the construction address, the legal description and the contractor
- residential or non-residential, new construction or substantial improvement
- the sewage system (public or private) and the lot size
- the flood zone and map panel number
- the base flood elevation, and the minimum first floor elevation above sea level or above the highest adjacent grade
The permit is valid for one year from the date of application.
What about septic?
The same office issues septic (OSSF) permits. The county posts its septic rules and an On-Site Sewage Facility Permit form updated on September 23, 2025.
What does the state require in San Saba County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
San Saba County’s development permit turns on the flood zone and the first floor elevation, and the septic permit on the system layout. A site plan showing the property lines, the home against the flood zone boundary, the septic tank and drain field, and the driveway serves both. Stampd draws site plans for manufactured home placements.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.