Karnes County, Texas

Manufactured home permits in Karnes County, Texas

Sources last checked

In Karnes County, a Determination Development Permit application is required before a septic application, and development applications are submitted through the county's permit portal. The Special Projects/Permitting Department in Karnes City handles both, along with 911 addressing. Septic systems need a professional design under county ordinance, and the authorization to construct is valid for one year.

manufactured homes installed in Karnes County in 2025 (TDHCA installation records)
30
the Karnes County Determination Development Permit, required before a septic application
Step 1
that a Karnes County septic authorization to construct is valid
1 year
Get a quote for Karnes County For dealers and installers

Who issues the permit in Karnes County?

The Karnes County Special Projects/Permitting Department handles development permits, septic permits, 911 addressing and road and bridge permits.

210 W. Calvert Ave., Suite 155, Karnes City, TX 78118. 830-780-3511. Monday to Friday, 8 am to 5 pm, closed noon to 1 pm.

Step 1: the Determination Development Permit

A Determination Development Permit application is required before a septic application. Submit it through the county’s online permit portal. The septic application refers to it for the 100-year flood zone.

Step 2: the septic permit

  • the 911 site address
  • the legal description, acreage, plat date and subdivision
  • a soil and site evaluation, with at least two soil excavations at opposite ends of the disposal area, shown on the site drawing
  • a site plan and design to scale. A professional design is required under Karnes County ordinance.

The authorization to construct is valid for one year. Arrange the inspection before the work is completed.

What does the state require in Karnes County?

The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.

What should the site plan show?

Karnes County asks for a site plan and design to scale with the soil test locations. Show the home, the septic system and its field, the soil borings, any well, the driveway, the property lines and the flood zone. Stampd draws site plans for manufactured home placements.

More help with Texas placements

The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.

FAQ

Common questions

What permit comes first for a manufactured home in Karnes County, Texas?

The Determination Development Permit. Karnes County says a Determination Development Permit application is required prior to a septic (OSSF) application, and development applications are submitted through the county's online permit portal. The septic application refers to the development permit application for the 100-year flood zone.

Who handles permits in Karnes County?

The Karnes County Special Projects/Permitting Department, 210 W. Calvert Ave., Suite 155, Karnes City, TX 78118 (830-780-3511), open 8 am to 5 pm Monday to Friday, closed noon to 1 pm. The same office handles 911 addressing and road and bridge permits.

What does a Karnes County septic application need?

The 911 site address, the legal description with acreage and plat date, a soil and site evaluation with at least two soil excavations at opposite ends of the disposal area, and planning materials including a site plan and design to scale. The application says a professional design is required under Karnes County ordinance.

How long is a Karnes County septic authorization valid?

One year from issue. The owner or installer must contact the office before completion to arrange the required inspection.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Sources

Every fact on this page comes from one of these, checked on November 23, 2026. Rules and fees change; confirm with the office before you submit. This page is general information, not legal advice.

  1. Karnes County, Permitting Department
  2. Karnes County, OSSF Application
  3. TDHCA, Manufactured Housing installation records Installations reported in Karnes County, January to December 2025

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077