Who issues the permit in Caldwell County?
For property outside city limits, Caldwell County issues a Residential Construction Permit under its Development Ordinance. The ordinance defines a residential structure as including a manufactured home, and requires the permit for:
- construction or installation of a residential structure
- additions that add bathrooms or bedrooms
- rebuilding after fire or flood where the cost exceeds 30% of the pre-damage value
In a city’s extraterritorial jurisdiction, an interlocal agreement may apply; without one, both the city and the county must approve, and the stricter rule wins. A property inside Lockhart, Luling or another city follows that city’s rules.
What does the application need?
| Item | What the ordinance asks for |
|---|---|
| Lot record | The recorded plat for a platted lot, or the metes and bounds description and surveyor’s sketch for an acreage tract |
| Ownership | A copy of the deed or other recorded ownership document |
| Taxes | Certificates showing all current taxes (county, city, school) are paid |
| Site sketch | See below |
| Water | A paid meter or impact fee receipt, a water bill, a well driller’s log, or an engineered or certified rainwater system |
| Septic | A copy of the approved septic permit issued through Caldwell County, where the home uses one |
| Floodplain | Base flood elevation (with elevation certificate), lowest existing floor and proposed elevation, where the home is in or within 300 ft of a floodplain |
The permit is valid for two years or until construction is complete, whichever comes first.
What must the site sketch show?
The ordinance lists it:
- existing structures
- existing and proposed driveways
- approximate distances from the home to the property boundaries
- the floodplain
- easements
- residential or public water wells
- the septic system, including tanks, pumps and effluent fields
Elevation and foundation rules
- The foundation of a residential home should be at least 12 inches above the surrounding ground.
- Inside or within 300 feet of a floodplain, the first finished floor must be at least 2 feet above the adjoining base flood elevation, documented by an elevation certificate and an engineer’s or surveyor’s floor elevations.
Does the lot qualify?
The parcel must be one of:
- an original tract, existing in its current configuration before September 1, 1997
- a lot legally platted through the Caldwell County Commissioners Court
- exempt from platting under the ordinance or state law
Exempt tracts still need 50 feet of frontage on a state road, county road or private street, and must follow the county’s driveway, septic, floodplain and 911 addressing rules. Any work in the county right-of-way, including a driveway apron, needs a right-of-way permit.
What does the state require in Caldwell County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
Caldwell County’s sketch list is detailed: structures, driveways, distances to every boundary, floodplain, easements, wells and the full septic layout. A measured site plan covering all of it, with floor elevations near a floodplain, matches the ordinance item for item. Stampd draws site plans for manufactured home placements.