Robertson County, Texas

Manufactured home permits in Robertson County, Texas

Sources last checked

In Robertson County, the septic (OSSF) permit is the main county permit for a manufactured home on its own system. Since September 1, 2025, the residential fee is $300, paid by cashier's check or money order to Robertson County after the application and design are in. The designated representative in Franklin reviews the planning materials and issues an Authorization to Construct, valid for one year.

manufactured homes installed in Robertson County in 2025 (TDHCA installation records)
58
Robertson County single-family septic (OSSF) permit since September 1, 2025; $500 multi-family or commercial
$300
that a Robertson County Authorization to Construct is valid; after that, reapply and pay again
1 year
Get a quote for Robertson County For dealers and installers

Who issues the permit in Robertson County?

For septic systems, the Robertson County OSSF designated representative, who keeps the records and does every septic inspection, permit and repair review in the county.

Robertson County OSSF, PO Box 427, Franklin, TX 77856. 979-828-6684.

What are the septic fees?

System Fee (since September 1, 2025)
Single-family residential $300
Multi-family or commercial $500
Re-inspection after a failed inspection Half the permit fee

Pay after all forms and designs are submitted, by cashier’s check or money order payable to Robertson County. Fees are non-refundable.

What are the steps?

  1. Get the application from Robertson County.
  2. Have a site evaluator, registered sanitarian or professional engineer evaluate the site. The evaluation shows what system the property needs.
  3. Hire a TCEQ-licensed installer: an Installer I for conventional systems and ET beds, an Installer II for non-standard and aerobic systems.
  4. Submit the application and planning materials before any installation: the soil evaluation, technical data, drawings and accurate directions to the site. The installer usually does this.
  5. For an aerobic system, file a notarized affidavit with the County Clerk and include a two-year maintenance agreement.
  6. After review and payment, the county issues an Authorization to Construct, valid for one calendar year.
  7. The installer schedules the final inspection. When it passes, the county issues a License to Operate.

A professional design is required for all proprietary and non-standard systems.

What does the state require in Robertson County?

The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.

What should the site plan show?

The septic planning materials include drawings and directions to the site, and the design depends on where the home, the system and its field, any well and the property lines sit. Show them with distances. Stampd draws site plans for manufactured home placements.

More help with Texas placements

The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.

FAQ

Common questions

Who issues septic permits for manufactured homes in Robertson County, Texas?

The Robertson County OSSF designated representative, PO Box 427, Franklin, TX 77856 (979-828-6684), who keeps the records and does all septic inspections, permits and repairs for the county.

How much is a septic permit in Robertson County?

Since September 1, 2025, $300 for a single-family residential system and $500 for multi-family or commercial. Fees are paid after all forms and designs are submitted, by cashier's check or money order payable to Robertson County, and are non-refundable. A failed inspection means a re-inspection fee of half the permit fee.

What are the steps for a Robertson County septic permit?

Get the application from the county, have a site evaluator, registered sanitarian or professional engineer evaluate the site, then hire a TCEQ-licensed installer. Submit the application and planning materials (soil evaluation, technical data, drawings and accurate directions to the site) before any installation. After review and payment, the county issues an Authorization to Construct; after the final inspection it issues a License to Operate.

Does Robertson County need a professional design for the septic system?

For all proprietary and non-standard systems, yes. A site evaluator can design ET beds and conventional systems; a registered sanitarian or professional engineer can design those plus aerobic and other TCEQ-approved systems. Aerobic systems also need a notarized affidavit filed with the County Clerk and a two-year maintenance agreement.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Sources

Every fact on this page comes from one of these, checked on November 23, 2026. Rules and fees change; confirm with the office before you submit. This page is general information, not legal advice.

  1. Robertson County, OSSF
  2. Robertson County, OSSF Instructions
  3. TDHCA, Manufactured Housing installation records Installations reported in Robertson County, January to December 2025

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077