Who issues the permit in Wilson County?
For property outside city limits, the Wilson County Permit and Development office in Floresville handles the development permit, septic permits and driveway permits on county roads.
The county’s permit requirements page lists four items for a placement:
| Item | Notes | Fee (March 2022 fee sheet) |
|---|---|---|
| 911 address verification | The physical address of the property | |
| Development permit | Every placement; the form has a box for a manufactured home | $100 |
| Septic (OSSF) permit | Where a septic system is built | $250 to $400 |
| Driveway permit | On county roadways | $250 residential (12 to 24 ft wide) |
Cities such as Floresville and La Vernia run their own permits.
What does the development permit need?
Wilson County says incomplete applications will not be accepted. The checklist:
- a complete copy of the recorded deed showing the applicant owns the property
- a site plan drawn to scale, with measurements
- in a subdivision, a copy of the recorded plat showing the lot and its distance to the closest intersection; outside a subdivision, an area map showing the property in relation to major roads
- the permit requirements page, the development permit application form and the exemption certificate page
- dated signatures
- a drainage study if the development footprint is 3 acres or more
- an elevation certificate if the structure is in a special flood hazard area, and in Zone A, the base flood elevation set by a Texas-licensed surveyor or engineer
What does the floodplain review add?
| Situation | Fee |
|---|---|
| Floodplain determination (outside the flood hazard area) | $100 |
| Development in a special flood hazard area | $300 |
| Elevation certificate review, if needed | $200 |
| Drainage review, if needed | $500 |
Outside the floodplain, the county issues an exemption certificate. Even then it advises no structure in any drainage or creek area, and recommends a floor at least 2 feet above natural ground where there is no clearly defined channel.
How does the septic permit work?
| Septic permit | Fee |
|---|---|
| Single-family residence, no design needed, not in a platted subdivision | $250 |
| Single-family residence with a conventional system, a required design, or in a platted subdivision | $350 |
| Commercial or alternative systems (aerobic, low pressure dosing, ET, drip) | $400 |
The Authorization to Construct is valid for 12 months. If the final inspection has not been done within a year, a new application and fee are needed.
What does the state require in Wilson County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
Wilson County requires the site plan drawn to scale, with measurements, and the floodplain review looks at drainage and creek areas. Show the home, the septic system, the driveway, the property lines, any drainage or creek area and the flood zone boundary, with distances. Stampd draws site plans for manufactured home placements to the county’s checklist.
More help with Texas placements
The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.