San Patricio County, Texas

Manufactured home permits in San Patricio County, Texas

Sources last checked

San Patricio County requires a floodplain development permit before any change to a property, and it names placing a manufactured home. The fee is $175 plus 5 cents per square foot outside the flood zone, or $275 plus 5 cents per square foot inside it. The application needs the deed, house plans and a site plan, and an elevation certificate showing the home 24 inches above grade or base flood elevation. Power is not connected until the Floodplain Manager approves it.

manufactured homes installed in San Patricio County in 2025 (TDHCA installation records)
70
San Patricio County development permit base fee for a single home outside the flood zone, plus 5 cents per sq ft ($275 base in the flood zone)
$175
above highest adjacent grade or base flood elevation, shown on an elevation certificate at completion
24 in

Who issues the permit in San Patricio County?

San Patricio County Floodplain Management issues the development permit.

Floodplain Management, Fairgrounds Dome, 219 W. 5th Street, Sinton, TX 78387. 361-587-3567. By appointment only.

The county says a floodplain development permit is required before making any changes to property, including placing a manufactured home, building a home or shed, moving large amounts of dirt, or installing or replacing a septic system.

Other county contacts: 911 Addressing 361-587-3564; Environmental Services 361-587-3500; Right-of-Way 361-364-9155.

What does the application need?

  • a completed application
  • the property or warranty deed, with the legal description
  • house plans and a site plan
  • a total project value affidavit
  • an elevation certificate showing the home 24 inches above the highest adjacent grade or base flood elevation, required at completion to get the occupancy certificate
  • a no-rise certificate, if the project is in a floodway

Only one residential home is allowed on a property of 5 acres or less. Two or more homes on one property count as a manufactured home park.

Apply online with the documents. After the first review, the county emails you to book an appointment for the provisional permit and tells you the fee. Plans should go in at least two weeks before review, and no work may start until every review is approved.

What are the fees?

A single manufactured home, inside a park or on a single lot, is charged like a single-family home:

Permit Flood zone (A, AE, V, VE) Outside the flood zone (shaded or unshaded X)
Single-family home or manufactured home $275 plus 5 cents per sq ft of enclosed area $175 plus 5 cents per sq ft of enclosed area
Septic only, new or replacement $50 plus the environmental process fee $50 plus the environmental process fee
Electric connection without a permit $50 $50
Variance, single-family residential $100 $100

Pay by check, money order or cashier’s check to San Patricio County; credit cards are not accepted. Fees are non-refundable, and all fees double if work starts before the permit.

When can the power be connected?

Only after final approval from the Floodplain Manager. The electric release needs the account owner’s details, the site address, the development permit number and issue date, and for AEP customers the ESID number.

How long is the permit valid?

One year from issue. Contact the Floodplain Manager before it expires. A one-year renewal is 75% of the original fee; a six-month renewal is 50%.

What does the state require in San Patricio County?

The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.

What should the site plan show?

San Patricio County asks for house plans and a site plan with every application. Show the home with its square footage, the property lines, the septic system and its field, the driveway, any other structures and the flood zone boundary. Stampd draws site plans for manufactured home placements.

More help with Texas placements

The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.

FAQ

Common questions

Does a manufactured home need a permit in San Patricio County, Texas?

Yes. San Patricio County says a floodplain development permit is required before making any changes to property in the county, including placing a manufactured home, building a home or shed, moving large amounts of dirt, or installing or replacing a septic system. Floodplain Management is at the Fairgrounds Dome, 219 W. 5th Street, Sinton, TX 78387 (361-587-3567), by appointment only.

What documents does San Patricio County need?

A completed application; the property or warranty deed with the legal description; house plans and a site plan; a total project value affidavit; and an elevation certificate showing the home 24 inches above the highest adjacent grade or base flood elevation, required at completion for the occupancy certificate. A no-rise certificate is needed in a floodway. Only one residential home is allowed on a property of 5 acres or less.

How much is a San Patricio County permit for a manufactured home?

A single manufactured home inside a park or on a single lot is charged like a single-family home: $175 base plus 5 cents per square foot of enclosed area outside the flood zone (shaded or unshaded X), or $275 base plus 5 cents per square foot in a flood zone (A, AE, V, VE). A septic-only permit is $50 plus the environmental process fee. Payment is by check, money order or cashier's check; credit cards are not accepted.

When can power be connected in San Patricio County?

Only after final approval from the Floodplain Manager. The electric release needs the account owner's details, the site address, the development permit number and issue date, and for AEP the ESID number. A $50 fee applies if the project did not need a permit.

How long is a San Patricio County development permit valid?

One year from the date of issue. Contact the Floodplain Manager before it expires to renew: a one-year renewal is 75% of the original fee and a six-month renewal 50%. All permit fees double for a project started before the permit.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Sources

Every fact on this page comes from one of these, checked on November 23, 2026. Rules and fees change; confirm with the office before you submit. This page is general information, not legal advice.

  1. San Patricio County, Residential Development Permitting Information (2026)
  2. San Patricio County, Floodplain Development & Permitting Fee Schedule Published as the 2026 fee schedule; the sheet's footer reads v2021_0201
  3. TDHCA, Manufactured Housing installation records Installations reported in San Patricio County, January to December 2025