Palo Pinto County, Texas

Manufactured home permits in Palo Pinto County, Texas

Sources last checked

In Palo Pinto County, the septic (OSSF) permit is handled by Palo Pinto County Public Works in Mineral Wells. A standard permit is $260 and an alternative system with maintenance is $460. An authorization to construct must be issued before any septic work starts, and only completed applications with the planning materials, site evaluation and fee are considered. The 911 address comes from the county 911 Addressing Coordinator.

manufactured homes installed in Palo Pinto County in 2025 (TDHCA installation records)
55
Palo Pinto County standard septic (OSSF) permit; $460 for an alternative system with maintenance
$260
Palo Pinto County septic permit transfer fee
$100
Get a quote for Palo Pinto County For dealers and installers

Who issues the permit in Palo Pinto County?

What Office Contact
Septic (OSSF) permits, rental communities, RV parks Palo Pinto County Public Works 100 SE 6th Ave, Suite 212, Mineral Wells, TX 76067. 940-659-1240
911 address 911 Addressing Coordinator Suite 211, same building. 940-659-1268
Floodplain development Flood Plain Administrator, Emergency Management 940-659-1267

What are the septic fees?

Permit Fee
Standard $260
Alternative system with maintenance $460
Transfer $100

What does the septic application need?

The owner or owner’s agent must get an authorization to construct before any septic construction begins. Submit:

  1. the application on the county’s form
  2. all planning material
  3. the results of a site evaluation
  4. the fee
  5. any variance request, with the application

Only completed forms are considered. Systems that need maintenance also need an Affidavit to the Public.

What about the 911 address and flood zones?

Request a 911 address from the 911 Addressing Coordinator with the county’s request form. For a site that may be in a flood hazard area, the Flood Plain Administrator has a floodplain development permit application and an elevation certificate form.

What does the state require in Palo Pinto County?

The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.

What should the site plan show?

The septic planning materials depend on where the home, the system and its field, any well and the property lines sit. Show them with distances, and mark any flood hazard area. Stampd draws site plans for manufactured home placements.

More help with Texas placements

The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.

FAQ

Common questions

Who issues septic permits in Palo Pinto County, Texas?

Palo Pinto County Public Works, 100 SE 6th Ave, Suite 212, Mineral Wells, TX 76067 (940-659-1240). The owner or the owner's agent must get an authorization to construct before construction of a septic system begins.

How much is a septic permit in Palo Pinto County?

The county lists $260 for a standard permit, $460 for an alternative system with maintenance, and $100 for a transfer.

What does a Palo Pinto County septic application need?

An application on the county's form, all planning material, the results of a site evaluation, and the fee. Variance requests go in with the application. Only completed forms are considered for approval. Systems requiring maintenance also need an Affidavit to the Public.

How do I get a 911 address in Palo Pinto County?

From the Palo Pinto County 911 Addressing Coordinator, 100 SE 6th Ave, Suite 211, Mineral Wells, TX 76067 (940-659-1268), using the county's 911 address request form.

Does Palo Pinto County require a floodplain permit?

The county posts a floodplain development permit application and an elevation certificate form through its Flood Plain Administrator, part of Emergency Management (940-659-1267). Check with that office whether the home site is in a flood hazard area.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Sources

Every fact on this page comes from one of these, checked on November 23, 2026. Rules and fees change; confirm with the office before you submit. This page is general information, not legal advice.

  1. Palo Pinto County, Public Works Department
  2. Palo Pinto County, 911 Addressing Coordinator
  3. Palo Pinto County, Emergency Management and Flood Plain Administrator
  4. TDHCA, Manufactured Housing installation records Installations reported in Palo Pinto County, January to December 2025

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077