Upshur County, Texas

Manufactured home permits in Upshur County, Texas

Sources last checked

In Upshur County, septic (OSSF) permits do not come from the county. The Northeast Texas Municipal Water District (NETMWD) is TCEQ's designated representative for septic systems in Upshur, Morris, Marion and Cass counties, and anyone building a structure with water-using fixtures must apply to it first. NETMWD lists $360 for a single-family residence. Check floodplain status and any city rules before placing the home.

manufactured homes installed in Upshur County in 2025 (TDHCA installation records)
122
NETMWD septic (OSSF) permit for a single-family residence in Upshur County ($610 multi-family or commercial), effective October 1, 2023
$360
counties where NETMWD runs the septic program: Upshur, Morris, Marion and Cass
4
Get a quote for Upshur County For dealers and installers

Who issues the permit in Upshur County?

For septic systems, not the county. The Northeast Texas Municipal Water District (NETMWD) is TCEQ’s designated representative for on-site sewage facilities in Upshur, Morris, Marion and Cass counties.

NETMWD, 903-639-7538.

NETMWD says anyone building a structure that uses water-using devices, or repairing or replacing a septic system, must first submit a completed permit application and the fee to the district. A manufactured home with plumbing on its own septic system falls under that.

Other approvals, such as floodplain, address and driveway, are separate. Check the parcel’s flood zone and whether it is inside Gilmer or another city before ordering anything.

What are the septic fees?

Permit NETMWD fee (effective October 1, 2023)
Single-family residence $360
Multi-family or commercial $610

Texas also charges a separate $10 state fee on each on-site sewage permit.

What does the state require in Upshur County?

The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.

What should the site plan show?

The septic design depends on where the home, the system and its field, any well and the property lines sit, so show them with distances. Mark any part of the lot in a mapped flood zone. Stampd draws site plans for manufactured home placements.

More help with Texas placements

The Texas manufactured home permit guide covers the state rules that apply in every county. Stampd draws site plans for manufactured home placements to the receiving office's checklist, and handles permit submission and follow-up for dealers and installers.

FAQ

Common questions

Who issues septic permits in Upshur County, Texas?

The Northeast Texas Municipal Water District (NETMWD), not the county. NETMWD is the designated representative for TCEQ's on-site sewage facility program in Upshur, Morris, Marion and Cass counties. Its phone number is 903-639-7538.

When is an Upshur County septic permit needed for a manufactured home?

NETMWD says anyone building a structure that uses water-using devices, or repairing or replacing a septic system, in its four counties must first submit a completed permit application and the fee to the district. A manufactured home with plumbing on its own septic system falls under that.

How much is a septic permit in Upshur County?

NETMWD lists $360 for a single-family residence and $610 for multi-family or commercial, effective October 1, 2023. Texas also charges a separate $10 state fee on each on-site sewage permit.

Get a quote

Tell us about a project, or about the work you have coming up.

Whether you have one home to place or a regular flow of installs, we will talk through what you need. Pricing is agreed in a proposal, based on the services you choose and your project volume.

Prefer to talk first? Call 936-444-4077 or email info@stampdpermits.com.

Service needed

Rather talk? 936-444-4077

Buying a home?

Stampd works with manufactured home dealers and installers, not directly with homeowners. Ask your dealer or installer whether they use Stampd.

Sources

Every fact on this page comes from one of these, checked on November 23, 2026. Rules and fees change; confirm with the office before you submit. This page is general information, not legal advice.

  1. Northeast Texas Municipal Water District, Onsite Septic Program Read from search excerpts; the page now asks for a sign-in
  2. TDHCA, Manufactured Housing installation records Installations reported in Upshur County, January to December 2025

Get a quote

Tell us what you are working on.

One project or a regular flow of installs. We will talk through what you need.

Service needed

Rather talk? 936-444-4077