Who handles a placement in Bell County?
Outside city limits, two offices are involved:
| Office | What it covers | Where |
|---|---|---|
| Bell County Public Health District, On-Site Wastewater Division | Septic (OSSF) permits, inspections and maintenance verification | bellcountyhealth.org |
| Bell County Engineer’s Office | Floodplain determinations, floodplain development permits, driveway permits, subdivisions | 206 N. Main Street, Belton, TX 76513. 254-933-5275 |
A property inside Killeen, Temple, Belton, Harker Heights or another city follows that city’s rules.
What about septic?
Bell County requires every septic system to be permitted, regardless of lot size or acreage. The district reviews the design, inspects the installation and verifies maintenance. It warns that the permit process can take time, so start well before the home is delivered.
| Septic fee | Amount |
|---|---|
| Single-family, standard | $610 |
| Single-family, professional design | $710 |
| Initial design review (paid to start review, applied to the permit fee) | $150 |
| Additional design review | $150 |
| Partial inspection, at the installer’s request | $150 |
| Failed inspection | Half the permit fee |
| Unpermitted installation | Twice the permit fee |
| Maintenance contract verification, per year | $20 |
Effective September 1, 2024.
What about floodplain?
The County Engineer’s Office is the floodplain administrator for Bell County and checks construction against local and federal floodplain rules. Request a floodplain determination or apply for a floodplain development permit through the Engineer’s online permits page.
Two rules from the county’s floodplain page:
- Filling in the floodplain requires an engineering analysis of how the fill changes flooding.
- Fill in the floodway is allowed only if an engineering study shows no rise in the flood level.
Driveways
Driveways on county roads need a driveway application through the Engineer’s online permits page. Approval is based on criteria that include a site visit, with public safety the priority in deciding the location and size.
What does the state require in Bell County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
The septic design, floodplain determination and driveway review each depend on where things sit on the lot. Show the home, the septic system, any well, the driveway connection and the floodplain boundary, with distances to the property lines. Stampd draws site plans for manufactured home placements.