Who issues the permit in Grayson County?
Grayson County does not require building permits or certificates of occupancy for single-family homes in unincorporated areas. A placement still goes through Grayson County Development Services and its OSSF Division.
| Office | Address | Phone |
|---|---|---|
| Development Services | 100 W. Houston Street, 3rd Floor, Sherman, TX 75090 | 903-813-5275 |
| OSSF Division | 100 W. Houston, Suite G3, Sherman, TX 75090 | 903-813-4253 or 903-813-4247 |
| Approval | When | Fee (April 2026) |
|---|---|---|
| Development certificate | A new 911 address, a new driveway culvert, or a floodplain determination | $50 online, $100 more on paper |
| Septic (OSSF) permit | A new or replacement septic system | $310 conventional, $330 aerobic |
| Floodplain development permit and elevation certificate | Any development on property with any special flood hazard area encroachment | $500 floodplain development review |
Zoning applies only in the Lake Ray Roberts Zoning District and the North Texas Regional Airport zoning area. Cities such as Sherman and Denison run their own permits.
How do you get the 911 address?
The address comes first, because the septic office will not accept an application without it.
- Mark the driveway entrance with a stake bearing your last name. Not marking it means a $100 re-inspection fee.
- Apply for a development certificate online through MyGovernmentOnline, with the Grayson CAD property ID, acreage, road name, a description of the work and whether the land was deeded from a family member.
- Upload the survey and the deed.
- Pay the invoice once the county accepts the application.
- The precinct foreman decides whether a culvert is needed. Install the right size, then call the E911 Coordinator (903-813-4200 ext. 2701) for the final driveway inspection.
- The address is assigned within 5 to 7 business days after the driveway passes.
A property reached by an access easement instead of frontage on a county road must present all the recorded documents.
How does the septic permit work?
- Have a current 911 address and property ID (from the tax statement).
- A licensed site evaluator or professional engineer does the site evaluation.
- If the site cannot take a conventional system, a professional engineer or registered sanitarian designs a non-standard or proprietary system.
- Proprietary systems come with a two-year maintenance contract, renewed for the life of the system, and the owner files an Affidavit to the Public with the County Clerk ($15 for the first page, $4 for each additional page).
- Submit the complete paperwork and fee. Permitting takes 5 to 7 days.
- Do not start construction until the Authorization to Construct is issued.
- Call at least one working day ahead for the final inspection. The certificate of approval is mailed once all documents are in.
What does the state require in Grayson County?
The same as everywhere in Texas: a TDHCA-licensed installer, installation to the right instructions, and a Notice of Installation (Form T) filed with TDHCA after the home is installed. Form T is a report to the state, not a local permit. The Texas guide explains each step.
What should the site plan show?
Grayson County’s address application runs on the survey and the driveway location, the septic design on the site evaluation, and the floodplain permit on where the home sits relative to the flood zone. A site plan showing the home, the driveway and culvert, the septic system, the property lines and any flood zone, with distances, ties them together. Stampd draws site plans for manufactured home placements.